�
<br />�
<br />MCA 2000-102
<br />AGENCY NAME: Water Conservation Board
<br />AGENCY NUMBER: PDA
<br />ROUTING NUMBER:
<br />$75,000
<br />CONTRACT
<br />THIS CONTRACT, made this 2otn day of November, 2000, by and between
<br />the State of Colorado for the use and benefit of the Department of Natural Resources,
<br />Colorado Water Conservation Board, hereinafter referred to as the CWCB and/or STa,TE, and
<br />the Board of County Commissioners of Mesa County, State of Colorado, 750 Main Street, P.O.
<br />Box 20000, Grand Junction, Colorado 81502-5010, hereinafter referred to as the CoNTRacTOR.
<br />FACTUAL RECITALS
<br />A. Authority exists in the law, and funds have been budgeted, appropriated and otherwise
<br />made available and a sufficient unencumbered balance thereof remains available for
<br />payment in Fund Number 424 Organization YYYY, Appropriation �0� GBL BO�Program
<br />WTRC, Object Code 5120, Reporting Category 0050, Contract Encumbrance Number
<br />C150050:
<br />B. Required approval, clearance, and coordination have been accomplished from and with
<br />appropriate agencies.
<br />C. Section 37-60-121(1)(b)(IV), C.R.S., authorizes the STaTE to make grants from the CWCB
<br />Construction Fund with specific authorization from the General Assembly.
<br />D. In September 1999, the CoNTRa,cTOR and the Grand Junction Drainage District ("District")
<br />held a public hearing on the need to address flooding issues relating to the Bosley Wash,
<br />at which the participants proposed several mitigation measures for addressing such issues.
<br />E. The CONTRACTOR in cooperation with the District, applied to the STATE for funding for a
<br />cooperative flood control planning investigation of the Bosley Wash area, also known as
<br />the Bosley Wash feasibility study, and a demonstration project in that area. For the
<br />feasibility study, the CONTRACTOR WIII contribute $5,000 in cash and $5,000 of in-kind
<br />services in the form of mapping, and the District will contribute $5,000 in cash and $10,000
<br />of in-kind services in the form of surveys. For the demonstration project the CONTRACTOR
<br />will contribute $12,500 of in-kind services and the District will contribute $12,500 of in-kind
<br />services.
<br />F. At its November 1999 meeting, the CWCB approved a grant of matching funds to the
<br />CoNTRa,cTOR from the CWCB Construction Fund in the amount of $50,000 to complete the
<br />Bosley Wash Feasibility Study (" STUDY ") and in the amount of $25,000 to apply to the costs
<br />of a demonstration project resulting from the Sru�Y (" PROJECT ").
<br />G. Pursuant to H.B. 00-1419, Section 9, the General Assembly authorized the CWCB to
<br />allocate $50,000 to the CorvTRacTOR to participate in the Bosley Wash feasibility study, and
<br />$25,000 to the CoNrRACTOR to participate in a Bosley Wash drainage and flood control
<br />Page 1 of 7
<br />
|