My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01976 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01976 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:25:16 AM
Creation date
3/4/2008 10:31:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0078FX
Contractor Name
Blue Lake Owners Association
Water District
0
County
Eagle
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MEMORANDUM <br /> <br />WATER CONSERVATION BOARD <br />DARIES C. LILE, P.E. <br />DIRECTOR <br /> <br />TO: <br /> <br />Bill Stanton <br />Bill Green 13Y <br /> <br />FROM: <br /> <br />DATE: <br /> <br />June 1, 1994 <br /> <br />SUBJECT: <br /> <br />Crystal Lakes Water and Sewer Association <br /> <br />We have recently discovered that we have a contract dated December 19, 1991 with the <br />Crystal Lakes Water and Sewer Association at Red Feather Lakes for a feasibility study of North <br />Pine Creek Reservoir. <br /> <br />On May 27th, I called Paul Barker at Resource Consultants in Fort Collins. They have <br />completed a draft feasibility study for the project (a new reservoir for augmentation and exchange <br />water) and are sending a copy for our review. <br /> <br />The Manager for Crystal Lakes is Dick Rosecrans and his number is 881-2250. <br /> <br />WEGlbj <br /> <br />cc: Mike Serlet <br />John VanSciver <br />~. ::;r::-! )1" IZ- <br /> <br />bj1365.memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.