Laserfiche WebLink
<br />RCE <br /> <br />A Division of Ayres Associates <br /> <br />May 27, 1994 <br /> <br />Mr. Bill Green <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Re: Upper Lone Pine Feasibility Study <br /> <br />Dear Mr. Green: <br /> <br />We contracted with Crystal Lakes Water and Sewer Association to study the feasibility of <br />constructing the Upper Lone Pine Lake in Red Feather Lakes, Colorado. This project was <br />funded in a cost-sharing agreement between Crystal Lakes Water and Sewer Association and <br />the Colorado Water Conservation Board. To complete this study, we are submitting our report <br />entitled, "Upper Lone Pine Feasibility Study" for your review and comment. <br /> <br />If you have any questions, please call. <br /> <br />Sincerely, <br /> <br />Resource Consultants & Engineers <br />A Division of Owen Ayres & Associates, Inc. <br /> <br /> <br />~Lf# <br /> <br />Manager, Civil Engineering <br /> <br />PRB:bbv <br /> <br />Enclosure <br /> <br />cc: Dick Rosecrans <br /> <br /> <br />Resource Consultants & Engir,eers <br />Engineers/Scientists/Surveyors <br />3665 J~K Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527 <br />(303) 223-5556. Denver Metro (303) 572-1806, FAX (303) 223-55?8 <br /> <br />GREEN.L TR <br />91-0711.00 <br /> <br />Printed on recycled paper <br />