My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ01940 (3)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJ01940 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:34 AM
Creation date
2/26/2008 1:51:51 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153372
Contractor Name
Hyannis Reservoir Company
Water District
0
County
Jackson
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />MEMORANDUM <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />TO: <br /> <br />File <br /> <br />Mike Serlet, P.E., Chief ~/ r <br />Water Supply Planning and'~nce Section <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />FROM: <br /> <br />DATE: October 30, 2003 <br /> <br />SUBJECT: Hyannis Reservoir Company <br />Feasibility Study Loan <br />Contract #C153372, dated December 1, 1981 <br /> <br />I spoke with Mark Haynes of the State Engineers Office of Dam Safety, who administers the listing <br />of all jurisdictional dams in the State, to determine that the Hyannis Peak Dam is not on the list of <br />existing structures. <br /> <br />I also spoke with Donna Taylor of Rocky Mountain Consultants, Inc. of Longmont, who completed <br />the original feasibility study that the CWCB financed, and determined that no further work was <br />completed on the project by the Hyannis Reservoir Company. <br /> <br />As of this date, the project to construct the Hyannis Peak dam by the Hyannis Reservoir Company <br />has not been completed, nor has any work beyond the completion of the project feasibility been <br />completed. <br /> <br />Therefore, the feasibility study contract #C153372 is closed and repayment will not be required <br />since the project has not been constructed during the initial 10 year period after the date of the <br />contract. <br /> <br />cc: Steve Biondo, Section B Accountant <br /> <br />Flood Protection. Water Supply Plarming and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Plarming <br />
The URL can be used to link to this page
Your browser does not support the video tag.