Laserfiche WebLink
<br />CONTRACT <br /> <br />~J tEN'tOR'ACENCVNUMBER <br />4-04-00 <br />CONT~~CT P9-;1 NUMBER <br /> <br />$16,000 <br /> <br />1 <br /> <br />~. <br /> <br />It' <br /> <br />THIS CONTRACT, made this 1st day of December <br />State of Colorado for the use and benefit of the Department of" Natural <br />(Colorado Water Conservation Board), <br />hereinafter refened to as the State, and '2 the Hvannis Reservoir <br />P. 6. Box 367; Walden, Colorado 80480, <br />hereinafter rderred to IS the contractor. <br /> <br />1981, by and between the <br />Resources <br /> <br />Companv. <br /> <br />WHEREAS. authority elCists in the Law and Funds have been budJtted. appropriated Ind otherwise made <br />a\'3ilable and a sufficient unencumbered balance thereof remains ava~bk for payment in Fund Number 400 R ; <br />OIL Account Nu~ber.52.5.lX.. Contract Encumbrance Number a S'"33~nd <br /> <br />WHEREAS. reqUired approval. clearance and coordination has been accomplished from and with appropriate <br />age ncies: and ' . <br /> <br />~~ERP.AS, pursuant to the provlslons of section 37-60-119, <br />Colorado Revised statutes 1973, as amended; the State Is <br />authorized to. construct certain water projects for the.benefit of <br />the people of the State of Colorado~ and <br /> <br />WHEREAS, the Hyannis Reservoir Company has made application <br />to the State for the improvement of the existing facility~ and <br /> <br />WHEREAS, the Contractor is a re~ervoir company within the <br />State of Colorado~ and <br /> <br />WHEREAS, section 24-30-1401, et seq., Colorado Revised <br />Statutes 1973 ,as amended, has beenfully complied with and the <br />certifica~e. required of the Conttact'or by section 24-30-1401, ~ <br />seg., Colorado Revised Statutes 1973, as amended, has been. <br />executed by the Contractor, is attached hereto as Appendix C, and <br />by this reference is incorporated herein as if the same had been <br />fully set forth in the body of this contract~ <br /> <br />NOW THEREFORE, it is hereby agreed that <br /> <br />1. The Contractor shall have a feasibility report prepared <br />and directed to the problem of improving the facilities of the <br />Hyannis Reservoir Company in accordance with a propo:;al for. it <br />project feasibility report prepared by the consultinl~ engineering <br />firm of Rocky Mountain Consultants of Estes park, ColoradO, and <br />approved by the State, received on September 11, and November 9, <br />1981, which proposal is attached hereto as Appendix }~ and made a <br />part of ~his contract. <br /> <br />2. Fifteen (15) copies of the final report called for in <br />this contract 'shall be furnished to the State not lal:er than <br />June 1,' 1982, unless such time is extended by mutual agreement of <br />the parties hereto in writing. <br /> <br />3~ As compefl~ for the services of the Contractor, the <br />State shall pay to the Contractor the sum of Sixteen Thousand <br />Dolla~s ($16,000) in the 'manner following: <br /> <br />a. Sixty percent (60%), to wit, Nine Thousand Six <br />Hundred Dollars ($9,600) of the total amount due in two <br />(2) monthly installments of Four Thousand Eight Hundred <br />Dollars ($4,800) each, commencing on February 1, 1982. <br /> <br />395.53.()1.c010 <br /> <br />Page I of -A. .pages <br />.(See instructions on revers.: or bst ,....) <br /> <br />,. ~bj .:3~P/L- <br />