My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
pd705-TO3-v3 _2_
CWCB
>
IBCC Process Program Material
>
Backfile
>
pd705-TO3-v3 _2_
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2009 6:01:20 PM
Creation date
7/26/2007 9:15:23 AM
Metadata
Fields
Template:
IBCC Process Program Material
Title
Scope of Work Task Order 2007-003
Date
3/7/2007
IBCC - Doc Type
Program Planning, Budget & Contracts
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />March 7, 2007 <br />Scope of Work Task Order 2007 - 003 <br />Technical Support for the Basin <br />Roundtables – Needs Assessment <br />Development and Project Management <br />Assistance <br /> <br />This task order will provide the roundtables with development of their needs <br />assessment s based upon their preliminary direction and project management <br />assistance until June 30 , 200 7 . Consultant will develop work plans and conduct <br />technical assistance to the roundtables as outlined below and assist State Project <br />Manager in overall project ma nagement of the Technical Support for the Basin <br />Roundtables. For all deliverables, associated with tasks described throughout this task <br />order, that produce data, technical reports, or other products that need to be <br />considered in terms of common technical p latform, the Consultant will work with the <br />CWCB to provide this information in a format that it can be tracked and included into <br />databases maintained by CWCB such as the Decision Support Systems and the Water <br />Resource Information Center . The budget for eac h roundtable will be tracked <br />independently and the Con sultant will report each Basin R oundtable budget status in <br />separate line items on invoices related to this task order. <br /> <br />Task 1 Development of Needs Assessment Work Plans <br />and Technical Assistance to Basi n Roundtables <br />All of the Basin R oundtables have requested technical assistance ( HB 06 - 1400 funding ) <br />for task order completion to the State Project Manager. The task orders and the level <br />of funding requested by each roundtable are described below. The tasks that the <br />consultant will complete for each roundtable through June 30, 2007 and associated fee <br />are also summarized. <br />1.1 Arkansas Basin Roundtable <br />1.1.1 Summary of Arkansas Basin Roundtable Request <br />To further their needs assessment the Arkansas Roundtable h as requested Consultant <br />support to coordinate with and collect, collate and screen reports and studies from the <br />Water Resource Research Institute of the Colorado State University, the Colorado <br />Water Conservation Board, the Colorado Geological Survey and in dividual water <br />agencies related to the Arkansas Basin. In addition, the Consultant will interface with <br />the needs assessment subcommittee and the USGS to provide information gathered <br />from the above entities. In addition, the Consultant will assist in organi zing a <br />"working group" of interested parties to develop a GIS relational database for data <br />collected under this effort. <br />? <br /> <br /> <br />1 <br />L: \ CWCB IMAGING \ CALEB \ IBCC PROGRAM MATERIAL \ PROGRAM PLANNING BUDGET & CONTRACTS \ CONTRACTS \ CDM TECH ASSISTANCE CONTRACT \ TO 2007 - 003 - NEEDS ASSESSMENT <br />DEV ELOPMENT AND PROJECT MANAGEMENT \ PD705 - TO3 - V3 (2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.