My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150099 Approval Letter
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C150099 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2011 8:06:11 AM
Creation date
3/26/2007 10:39:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150099
Contractor Name
Amity Mutual Irrigation Company
Contract Type
Loan
Water District
67
County
Kiowa
Bill Number
HB 02-1152
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�TAT� OF C�LOI�ADC) <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Coloradq 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 November 27 , 20�� <br />www.cwcbstate.co.us <br />Mr. Keith Clark, President <br />Amity Mutual Irrigation Company <br />P.O. Box 187 <br />Holly, CO 81054 <br />Dear Mr. Clark, <br />._. ,� <br />V � 1 <br />n�ZTT <br />��r. : , <br />�� - _ <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />CWCB Director <br />Dan McAuliffe <br />Deputy Diredor <br />RE: Neenoshe Reservoir Dam Rehabilitation <br />Loan Recommendation <br />I am pleased to inform you that the Colorado Water Conservation Board (CWCB) has <br />recommended your loan to the General Assembly for approval. Your loan request will be <br />included in the Board's year 2002 Water Project Construction Bill. Loan funds will be <br />authorized in spring 2002, once the Governor has signed the biil. I understand the loan will <br />be used to rehabilitate the Neenoshe Reservoir Dam. <br />The Board approved a loan from the Construction Fund in a maximum amount of <br />-$�69 are 2.75°lo for 3Q y�ars. I haue attached a copy of the updated <br />Board memo concerning the Amity Mutual Irrigation Company. Please refer to page 4 of <br />that memo and to the section "Action taken by the CWCB November 20, 2001." <br />When the Board recommends a loan there remain several conditions: <br />a) A Feasibilitv Studv is required. John Van Sciver of the CWCB Staff has completed a <br />study titled "Feasibility Study - Rehabilitation of the Neenoshe Reservoir Dam" dated <br />November 2001. The report meets the requirements of the CWCB Construction Fund <br />Guidelines for feasibility studies. <br />b) An approved contract must be in place before funds can be advanced. Jan Illian will <br />place this project on our contracting "hot list" and will initiate the loan contracting <br />process. We understand the Company plans to start construction in fall 2002 and our <br />goal is to have a signed contract in place by that time. <br />Flood Protection • Water Project Planning and Financing • Stream and Lake Protection <br />Water Supply Protection . Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.