Laserfiche WebLink
Amity Mutual Irrigation Company <br />November 27, 2001 <br />Page 2 <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will be <br />the basis of the monthly pay estimates for disbursement of your loan funds. <br />On behalf of the Board, I would like to thank you for applying for a loan from the Colorado <br />Water Conservation Board. <br />Sincerely, <br />� <br />Mi e Serlet, PE, hief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br />Attachments: Updated Memo: Amity 1101 mmo <br />cc (w/Attachment): Mr. Harold E. Miskel, Board Member, Colorado Water Conservation Board <br />Donald Steerman, P.O. Box 390, Lamar, CO 81052 <br />Terry Arnold, URS Corp., 8181 East Tufts Ave., Denver, CO 80237 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br />C: Projects\Proj-NewWmity 1101Ltr <br />