My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11749
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:43 PM
Creation date
10/12/2006 5:09:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies - US DOI-BOR - Region 4
State
CO
Basin
Statewide
Date
8/30/1967
Author
DOI-BOR
Title
Report by the BOR to the CWCB - Region 4
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />..". <br /> <br />; <br /> <br /> <br />00D693 <br /> <br />. <br /> <br />. <br /> <br />REPORT BY THE BUREAU OF RECLAMATION, REGION 4, <br />TO THE COLORADO WATER CONSERVATION BOARD <br /> <br />August 30, 1967 <br /> <br />I am happy to be with you here in Rifle today on the eve of the dedica- <br /> <br />tion of our Silt Project. I understand that you plan to attend the cere- <br /> <br />mony at Rifle Gap Dam tomorrow, and I certainly want to add my personal <br /> <br />invitation to you to do so. <br /> <br />Today I would like to give you a rundown on Region 4 construction and <br /> <br />planning activities and other matters of interest to you. <br /> <br />CONSTRUCTION <br /> <br />At Glen Canyon the contractor has completed all work connected with <br /> <br />installation of the left diversion tunnel plug and spillway elbow. Self- <br /> <br />guided tours have been in operation through the dam and powerplant since <br /> <br />May 25, 1967. Since July 1 these tours have been initiated from the <br /> <br />nearly completed Visitor Center. <br /> <br />On September 14, at 2:30 p.m., Morrow Point .Dam will be "topped out" <br /> <br />with placement of the last bucket of mass concrete. Since the crest of <br /> <br />the dam is only 12 feet wide, it will not be practical to hold a large <br /> <br />public ceremony. The occasion of "topping out" is an important mile- <br /> <br />stone in construction of any concrete dam, but it is particularly note- <br /> <br />worthy in that Morrow Point Dam is the Bureau's first double-curvature, <br /> <br />thin -arch structure. The underground powerplant is also an unusual <br /> <br />"first" for our agency. A Japanese firm, Mitsui and Company, has <br />
The URL can be used to link to this page
Your browser does not support the video tag.