Laserfiche WebLink
<br />r\ <br /> <br />002219 <br /> <br />t <br /> <br />t <br /> <br />/" <br />/ <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br />71-1 I>leeting <br /> <br />Construction <br /> <br />Generating Unit 1 of the Morrow Point Powerplant of the <br />Curecanti project went on the line at 10:10 a.m. December 23, 1970. <br />Operational testing of the remaining Unit 2 was completed on <br />February 4, 1971. Construction of the visitor facility and sewage <br />treatment plant is approximately 36% complete. <br /> <br />At present it is anticipated that a contract for construc- <br />tion of the Crystal Dam and Powerplant of the Curecanti project will <br />be awarded late this fiscal year. <br /> <br />Feasibilitv Investiqations <br /> <br />The proposed draft of the report on the Bluestone project <br />near Grand Junction, Colorado is being finalized in the regional <br />office of the Bureau of Reclamation in Salt Lake. <br /> <br />The report on the Upper Gunnison project near Gunnison, <br />Colorado should be finished in fiscal year 1971. <br /> <br />Water supply and plan formulation studies are <br />for the Basalt project near Glenwood Springs, Colorado. <br />of the report is scheduled for fiscal year 1972. <br /> <br />continuing <br />Completion <br /> <br />Colorado State Water Plan <br /> <br />The Plan of Study has been reviewed by the interested <br />agencies of the State and by the Bureau of Reclamation. The final <br />draft has been completed, and will be distributed as soon as the <br />outside cover has been printed. <br /> <br />ewCB/LDN/rom - 3/2/71 <br /> <br />~ <br /> <br />-.Ii, <br />