Laserfiche WebLink
<br />.""," <br /> <br />"-"".7).)-.\ <br />'1' <br /> <br />f <br />~ <br />t <br /> <br />.~~'~~~i <br /> <br />,; <br />, <br />, <br /> <br />HISTORY 01' TIlE GLEN CANYON BNVIRONKBNTAL STtJDIBS <br /> <br />1956 Construction authorized for Glen Canyon Dam. <br /> <br />1963 Glen canyon Dam construction completed. <br /> <br />1964 First power generation at Glen Canyon. <br /> <br />1966 Congressional authority for the Glen Canyon Dam Uprating <br />study. <br /> <br />" <br />" <br /> <br />1975 Funding available for the Glen Canyon Dam Uprating <br />study. <br /> <br />;'-;- <br /> <br />1979-1981 Public <br />Study, a series <br />seeping meetings. <br /> <br />1980 Glen Canyon Dam filled with a total capacity of 27 mil- <br />lion acre feet. <br /> <br />meetings about the Glen Canyon Dam Uprating <br />of seven newsletters to the public, and <br /> <br />~~~ <br />(", <br />'" <br />,..; <br />, <br /> <br />.,. <br /> <br />1983 Secretary of the Interior initiates the Glen Canyon En- <br />vironmental Studies. <br /> <br />1983 Meeting with U.S. Fish and Wildlife Service, National <br />Park Service, Bureau of Reclamation, and Arizona Department <br />of Game and Fish to develop research plans, determine costs, <br />and initiate field work on the Glen Canyon Environmental <br />Studies. <br /> <br />June 3 to Auqust 11, 1983 Flows exceeding powerplant capac- <br />ity (31,500 cubic feet per second) are bypassed at Glen Can- <br />yon Dam and reach 92,500 cfs. <br /> <br />Sept-mber 1983 Agency inspection trip (with members of Bu- <br />reau of Reclamation, National Park Service, U.S. Geological <br />Survey, U.S. Fish & Wildlife Service, Arizona Game and Fish <br />Department, commercial river runners, and consultants to the <br />agencies) to determine impacts of the 1983 high water, deter-. <br />mine the value of future Glen Canyon impact studies, and de- <br />velop recommendations on how and whether to continue the Glen <br />Canyon Environmental Studies. <br /> <br />January 30, 1984 Based upon the recommendations of the <br />agency inspection trip, the Action commissioner of Reclama- <br />tion recommended a continuance of the GCES. Each agency was <br />directed to develop specific study plans and objectives . <br /> <br />January 30, 1986 National Academy of Science, Water Science <br />and Technology Board asked to review the technical merit of <br />the Glen Canyon Environmental Studies. <br /> <br />~ " <br /> <br />.,-;' <br />.. <br />,.. ~ <br /> <br />, <br />.4 <br />;t.-x <br />;"".: <br />~),; <br />'.~: <br /> <br />~: <br /> <br />" . <br /> <br />. I <br />