My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08329
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08329
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:47 PM
Creation date
10/12/2006 2:54:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.126.O
Description
San Miguel Project
State
CO
Basin
San Juan/Dolores
Water Division
4
Date
11/23/1981
Title
CWCB Board Memo: Agenda Items 7 8 &10b - December 3-4 1981 Board Meeting--Staff Response to Board's September Directive
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br />.. <br />, <br /> <br />first step should be to request assistance from the Bureau of <br />Recldmdtlon In RXdmlnlng selected dspecls of lhe West Dlvlde <br />project (see attached letter). I will report back to the Board <br />at the February or April meeting on the results of this analysis. <br /> <br />(2) A feasibility study 01 the Grand Mesa project, to <br />include consideration of financlng problems, has been initiated <br />(see agenda item lOb). <br /> <br />(3) The Fruitland Mesa project Is presented for the Board's <br />consideration for funding (see agenda item 7c). <br /> <br />(4) Front-end cost-sharing is proposed for the Narrows and <br />Animas-La Plata projects (see agenda item 7b). <br /> <br />(5) The proposed five-year capital investment budget (see <br />agenda item 8) includes funding for the West Divide, San Miguei, <br />Grand Mesa, and Fruitiand Mesa projects and front-end <br />cost-sharing for the Narrows and Animas-La Plata projects. <br /> <br />(6) The proposed capital investment budget also Includes a <br />category for finanCing the repair of projects with dam safety <br />problems. In addition, three of the projects presented for the <br />Board's consideration under agenda item 7c are dam repair <br />projects, two being from the State Engineer's list of high <br />priority projects. <br /> <br />(7) <br />financing <br />item 7a). <br /> <br />The staff has reviewed and analyzed existing state <br />mechanisms and the issues associated therewith (see <br /> <br />The <br />Board so <br />meeting. <br /> <br />staff will address these matters further should the <br />desire based upon Its deliberations at the December <br /> <br />JWM/gI <br /> <br />Attachment <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.