Laserfiche WebLink
<br />41 ". <br /> <br />. <br /> <br />. <br /> <br />~ ... ., .- <br />'~:,jJ.1 <br /> <br />TABLE 13. - - l1enefi ts from Rcduct ion of Operat ion, ~laintenance and <br />Replacement Costs of the Lxisting Barrier Dam and Pueblo Floodway <br />(June 1967 prices) <br /> <br />General <br /> <br />Estimated replacement cost, Barrier Dam <br />Estimateu'rep]acement cost, Pueblo Floodway: <br />Without Barrier Dam <br />Iii th Barrier Dam <br /> <br />$10,000,000 <br /> <br />4,000,000 <br />2,000,000 <br /> <br />Estimated effective date of Pueblo Dam and Rcservoir is 1970. <br /> <br />Replacement Savings <br /> <br />Present lVorth <br /> <br />Average Annual <br />Equivalent <br /> <br />Repl~cclll"nt of P,arriC'r Pmn and <br />Puehlo Flood""y "ithout Pueblo <br />DaJ'l in years 2000 and 2117S <br /> <br />$ 6, 115,000 <br /> <br />$200,000 <br /> <br />Replace:ITlcnt of Barrier Dam in <br />2070 and replaccments of <br />Pueblo FloodHa)' in years <br />2000 and 2075 "ith Pueblo <br />Dam <br /> <br />1,013,400 <br /> <br />33,000 <br /> <br />Savings creditable to Pueblo Dam <br /> <br />167,000 <br /> <br />Present \;orth of rcmaining 40 <br />years existing Barrier Dam <br /> <br />4,000,000 <br /> <br />131,000 <br /> <br />Net savings creditable to Pueblo <br />Dam <br /> <br />36,000 <br /> <br />Operation & ~laintenance Savings <br /> <br />Barrier Dam <br />Pueblo Floodway <br /> <br />50,000 <br />10,000 <br /> <br />Operation and ~laintenance <br /> <br />60,000 <br /> <br />Total Net Savings for Reduction of Operation, <br />Maintenance and Replaccment Costs of Ex- <br />isting Flood Control liorks <br /> <br />96,000 <br /> <br />36 <br />