Laserfiche WebLink
<br />, . <br /> <br />.' <br /> <br />Reach <br /> <br />A:'~'''; (:=:- <br />'l:~-;j' <br /> <br />. <br /> <br />. <br /> <br />Ri vel' Mi 1 e <br /> <br />1,185.7 - 1,205.9 <br /> <br />1,205.9 - 1,230.1 <br /> <br />1,230.1 - 1,258.6 <br /> <br />1,258.6 - 1,267.0 <br /> <br />1,267.0 - 1,276.2 <br /> <br />1,276.2 - 1,283.6 <br /> <br />1,283.6 - 1,287.2 <br />1,287.2 1,293.7 <br /> <br />86. In each of the nine reaches, areas inundned and d~mages "'ere <br />estimated for a numher of flood dlschnrp,es and di scharge-d,u.',age relation- <br />ship curves prcllarcll. niscl\ar~c-darn~gc data were correl~~ted witll <br />discharge-frequency relationships to derive the damage-frequency relation- <br />ship as demonstrated for a t)"picD.I rC:J.ch on plate 6. The total esti.mai:ed <br />average annual monetary flood damage under existing conditions of develop- <br />ment is $1,744,800 (,June 1967 prices) as summarized in table 11. This <br />would be reduced by $499,500 to $1,245,300 by Pueblo Dam and Reservoir <br />as also indicated in the tabulation. <br /> <br />Description <br /> <br />2 <br /> <br />Las Animas Consolidated Diversion Dam to <br />a point above Timpas Creek <br />Above Timpas Creek to a point above <br />Apishapa River <br />Above Apishapa River to a point above <br />lIuerfano River <br />Above lIuerfano River to a point above <br />Chico Creek <br />Above Chico Creek to a point ahove <br />St. Charles River <br />Above St. Charles River to a point <br />above Fountain Creek <br />Above Fountain Creek to Dry Creek <br />Dry Creek to Pueblo damsite <br /> <br />\: <br /> <br />" <br />" <br /> <br />TABLE 11. -- Average Annual Flood Damages ahove John Martin Reservoir <br />(June 196 7) <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br /> <br />8 <br />9 <br /> <br />',' <br />I) \ <br />, <br /> <br /> Iii thout Pueblo With Pueblo Dam <br /> Reach Dam and Reservoir and Reservoir Di fference <br />1 (Las Animas) $30,000 $25,600 $4,400 <br />I (Rural, etc. ) 14,700 12,800 1,900 <br />2 (La Junta) 129,200 106,400 22,800 <br />2 (N. La Junta) 269,100 227,600 41,500 <br />2 (Rural, etc.) 248,800 206,400 42,400 <br />3 397,700 333,000 64,700 <br />4 197 ,600 129,400 68,200 <br />5 159,800 97,300 62,500 <br />6 117,000 65,200 51,800 <br />7 78,300 37,200 41,100 <br />8 (Pueblo) 12,600 1,'100 11 ,200 <br />9 (1) 90,000 3,000 87,000 <br /> Total $1,744,800 $1,245,300 $499,500 <br /> 1 , <br /> <br />Includes Pueblo Water horks facllltles. <br /> <br />31 <br />