My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08275
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:35 PM
Creation date
10/12/2006 2:51:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />c.. <br />C"': <br />C\l <br /> <br />c <br /> <br />of the project, classified generally under the F. P. C. system <br /> <br />of accounts and grouped under the principal units of operation. <br /> <br />In considering these annuities, physical wear and tear only <br /> <br />was taken into account. <br /> <br />In selecting the annuity appropriate to a single item of <br /> <br />equipment, such for example as a main generator, the following <br /> <br />features were passed in review: <br /> <br />(1) The character of the structure and its sub- <br /> <br />divisions under such items as castings, forgings, <br /> <br />stampings, windings, etc. <br /> <br />(2) Stationary and moving parts, end the character <br /> <br />and extent of probable physical wear and tear. <br /> <br />(3) The first cost of the item. <br /> <br /> <br />(4) The estimated mean weighted life. <br /> <br /> <br />(5) The probable cost of replacement in relation <br /> <br />to original cost. <br /> <br />(6) The annuity required to produce the replacement <br /> <br />sums required, accumulated OVGr the period of <br /> <br />amortization, but anticipClting partial withdrawals <br /> <br />at distributed intervals throughout this ueriod. <br /> <br />( Se e no te appended ('In page 22.) <br /> <br />The group of operative lll1its Nl-N4 was then considered carefully <br /> <br />under this schedule of factors, and estimates made of the annuities <br /> <br />appropriate to the several items as listed in exhibit 63. <br /> <br />,,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.