Laserfiche WebLink
<br />OOl73S <br /> <br />REPLY TO QUESTIONNAIRE FROM JOHN P. SAYLOR, I,I.C. <br />TO S~CRETARY OF THE INTERIOR <br />RE. H. R. 236 <br />FRYIlnPAN-ARKANSAS PROJECT OF COLORADO <br /> <br />This statement has been prepared to answer the questionnaire which <br />acoompanied the letter dated November 10, 1953 from the Honorable John <br />p. Saylor, M.C., to the Secretary of the Interior. <br /> <br />For oonvenience, each question from the questionnaire is stated in <br />the ensuing text, follo"~d by the ans~er. Large statistical tables are <br />l'ound in the back in numerical sequence rather than being interleaved <br />in the text. EII"ery attempt has been made to answer each question as <br />completely as possible in the time available. \Vhere doubt existed as <br />to the scope or meaning of a question, at least one interpretation or <br />assumption is stated and ~swered. <br /> <br />" <br /> <br />I' <br />I <br />r <br />" <br />Ii <br /> <br />I, <br /> <br />The questionnaire refers to estimates and data set forth in the <br />project planning report. Cost estimates and financial and economic <br />analyses in the report of January 1950 were revised by Secretary <br />McKay's Report to the President dated April 30, 1953. Current cost <br />estimates and other requested analys~s are compared vdth corrwsponding <br />data in the Secretary I s report rather than with data in the original <br />report. . Both reports -arc con-cained in House Document No. 187, 83d <br />Congress, 1st Session, That document ,dll be cited subsGquently only <br />as H. D. 187. <br /> <br />Ii <br /> <br />1. Question - Furnish tabulations of C'stimated construction costs <br />and annual costs, itemized by unics or features, comparing estimates as <br />set forth in project planning report .and r'cviscd estimates at current <br />price. <br /> <br />Answ~r - The estimated total project construction co~t based <br />on October bS3 prices is iil77 ,432,000 as cor.rparod to $172,898,000 fOl' <br />January 1953 prices. The increase of' ~4,534,OOO is 2.6 percent of the <br />January 1953 costs. Annual operation, maintenance and relJlacc:nent C0sts <br />for the January 1953 analysis Tlere estilTk1. ted on a long range projected <br />price level, consequently, the .effect of the change in price index <br />betwoen Janu~ry and October 1953 would be n~gligiblc when applied to <br />annual costs. The accrn1panying table 1 presents an itemized list, <br />comparing eanstruction costs of ind~vidual features shITring Jan~1.ry an~ <br />October 1953 prices and annual costs based on long ran;:;o projecLcd prie_ . <br />The January 1953 costs in tc!ble 1 correspond te cests sho;'m in t',olc IV, <br />page 7, H.D. 187. <br />