My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08242
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08242
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:26 PM
Creation date
10/12/2006 2:50:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.09
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
1/1/1992
Author
USDOI-BOR
Title
Newsletter - Colorado River Studies Office - Vol.4
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Western Area Power Administration <br />EIS Update: Alternatives Developed <br /> <br />By: Dave Sabo, Manager, Environmental and Public <br />Affairs, Western Area Power Administration, Salt <br />Lake City Office <br /> <br />Work is progressing on the development of alternatives <br />as part of Western's Salt Lake City Area Integrated <br />Projects (SLCA/IP) Electric Power Marketing <br />Environmental Impact Statement. Western officials <br />indicate that public information meetings will be <br />scheduled for March 1992 to present these alternatives <br />to the public. <br /> <br />The goal of the EIS process is to examine how Western's <br />power marketing criteria and programs affect <br />Colorado River Storage project operations and the <br />~reooal~p~~ro=~alandh=anenv~nmen~ <br />as a result of these programs, <br /> <br />As part of the EIS process, alternatives to the SLCA/IP <br />electric power marketing programs are being <br />developed by EIS ream members from Western and <br />Argonne National Laboratory. Some of the programs <br />under study include long-term, firm-power, and <br />energy sales; economy energy sales; reserve capacity <br />sales; and emergency services. The Bureau of <br />Reclamation, U.S. Fish and Wildlife Service, and the <br />National Park Service are participating as cooperating <br />agencies. <br /> <br />A series of public information meetings will present the <br />alternatives developed during the EIS process. These <br />meetings, originally scheduled for October 1991, are <br />rescheduled for March 1992. The dates for these <br />meetings will be announced in a Federal Register notice <br />and through mailings from Western's Salt Lake City <br />Area Office as well as press releases and paid <br />advertisements. <br /> <br />During the scoping process, Western received more <br />than 21,000 comments on issues and approaches in <br />accomplishing the EIS, A number of comments <br />suggested that Western incorporate results of <br />environmental studies presently underway such as the <br />Glen Canyon Environmental Studies and ongoing <br />Section 7 consultation at Flaming Gorge Dam. <br /> <br />Representatives from Western are available to give <br />presentations on the EIS to groups or organizations, <br />Copies of the EIS Scoping Analysis are available for <br />review at several libraries and at Western's Area <br />Offices. For information on the location of these <br />libraries or to be placed on Westerns mailing list for the <br />Electric Power Marketing EIS, call the Salt Lake City <br />Area Office at (801) 524-5493 or FrS 588-5493. <br /> <br />Where Do <br />We Go <br />From Here <br /> <br />? <br />. <br /> <br />Now that the alternatives have been selected for <br />impact analysis in the draft EIS, the next step is <br />to evaluate each alrernative for environmental <br />~pacts on the =~al and cul~al resources of <br />the Glen and Grand Canyons, ~pacts on water <br />and power operations, and socioeconomic <br />considerations. <br /> <br />Between now and the planned distribution of <br />the draft EIS, the EIS team will be performing <br />impact analysis and writing the EIS. Impact <br />assessment is the very heart of the EIS process <br />and requires much time and arduous analysis <br />to fully evaluate each alternative. <br /> <br />The environmental analysis of the alternatives <br />will be based on scientific data gathered during <br />the Glen Canyon Environmental Studies, <br />Phase I of these scientific studies began in 1983 <br />and was complered in 1988. Phase II progress <br />reports and preliminary findings were <br />completed in 1991. These technical studies <br />were based on data collected from research <br />flows conducred between June 1990 and July <br />1991. Phase II reports will continue to be <br />updated and will go through a technical review <br />process. Additional studies will continue as <br />part of the long-term monitoring research <br />program. Power modeling and socioeconomic <br />studies will be available in March 1992 as the <br />basis for analysis of water and power operation <br />impacts and socioeconomic impacts, <br /> <br />Upon completion of the impact analysis and <br />preparation of the re~rt, the draft EIS will be <br />distributed to interested organizations, Public <br />hearings will be conducred during the 90-day <br />comment period at various locations. All of the <br />comments received will be evaluated and <br />considered in the final EIS as appropriate. <br /> <br />We will keep you informed of our progress <br />through future newsletters. <br /> <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.