My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08224
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:47:22 PM
Creation date
10/12/2006 2:49:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101
Description
Glen Canyon Dam/Lake Powell
State
AZ
Basin
Colorado Mainstem
Date
1/1/1962
Title
News Articles - Press Releases - Miscellaneous Topics
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Newsletter Number 4 <br />September 1980 <br /> <br /> <br />COLa 'AI <br />CON"E '..A TER <br />.:l RVAnON B <br />OARD <br />Introduction <br /> <br />Durango Projects <br />P.O. Box 640 <br />Durango, Colorado 81301 <br />(303) 247-0247 <br /> <br />'>.,- <br /> <br />" f,'"l>.., <br /> <br />"61.11'1 (AN~ON <br />DAN <br /> <br />ter & Power ResourDes Service <br /> <br />This newsletter, the fourth on the Glen Canyon Dam Power Plant Expansion, will <br />explain the decision needed early in 1981 on what size to recommend for the power <br />plant expansion or not having a project and the start of an editorial page for the <br />newsletter. Also covered will be a data collection program for evaluating the <br />fishery between the dam and Lee's Ferry. <br /> <br /> <br />Decision <br /> <br />:',,-;'"; <br /> <br />~~ <br /> <br />As stated in Newsletter Number 3, the first major decision for the study will occur <br />early in 1981 and will involve selection of a size; either 125 megawatts, 250 mega- <br />watts, or deciding that the project should not be built and the study should be <br />discontinued. <br /> <br />Editorial Page <br /> <br /> <br />Water and Power will prepare brief descriptions of the impacts and economic feasi- <br />bility of a 125-megawatt and a 250-megawatt power plant expansion. A description <br />of the alternative of not having a project will also be described for comparison <br />with the two alternative expansion sizes. These descriptions will be given to the <br />teams for review, discussion, and suggestions; and public meetings will be held to <br />discuss the sizes or not having a project. <br /> <br />In order to further promote discussion on the project, an editorial page will be <br />added to future newsletters. The procedure will be that if people would like to <br />make a statement on the project they are encouraged to send a letter with their <br />ideas to this office with their name and address. We will print the letters in <br />the following newsletter. We may have to edit some letters for length. We hope <br />that the newsletter editorial page will provide another forum for discussion of <br />issues on this important study. <br /> <br />Jl'\' <br /> <br />~ <br /> <br />(;::. : <br /> <br />:." <br />
The URL can be used to link to this page
Your browser does not support the video tag.