Laserfiche WebLink
<br />~, ", t...... <br /> <br />. <br /> <br />. <br /> <br />Animas-La Plata Pro~ect. Colorado-New Mexico <br /> <br />it reconnaissance report was completed in November and circulated <br />to interested local and State agencies. The plan of develo~ment as noW <br />fonnulated appears worthy of further detailed investigation. Foundation <br />drilling operations are now in progress on ~';eadows damsite, Topography <br />of the Teft Reservoir site is being obtained under outside contract. <br />No work other than foundation drilling and materials exploration are pro- <br />grammed for the balance of F.Y. 1955. <br /> <br />Dolores Pro,i ect. Colorado-Utah <br /> <br />Control surveys have been initiated in the ~jontezuma Valley area <br />in preparation for detailed land classification work later on in the year. <br />Topography for l'icPhee Reservoir is being obtained under outside contract. <br /> <br />Hammond Pro,i ect. New hexico <br /> <br />Control surveys are essentially completed on the project area and <br />a detailed land classification has been started. <br /> <br />Nava,io Pro.iect. Ne>l HexicC' <br /> <br />All investigational work has been completed for the feasibility <br />report except the detailed land classification of about 10 percent of the <br />nonreservation land. The feasibility report on the overall project is <br />being prepared by the Bureau of Indian Affairs. <br /> <br />Washoe Pro,iect. California-Nevada <br /> <br />The final draft of the feasibility report was submitted to the <br />COlNl\issioner in Septanber. It has been circulated for review under the <br />Flood Control Act of 1944 and is expected to be submitted to Congress for <br />consideration this session. Surveys and studies for use in a definite <br />plan report are being carried forward. <br /> <br />~1:~'\ <br /> <br />r;?J:'7 <br /> <br />Q tJ,,>>~,,-, f M/-Jz <br /> <br />R~onal Project DevelopreeDt Engineer <br /> <br />4 <br />