My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08166
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:24 PM
Creation date
10/12/2006 2:47:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.850
Description
Metro Water Supply Investigation - MWSI
State
CO
Basin
South Platte
Date
8/16/1994
Author
Hydrosphere
Title
Phase II Plan of Study
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I . <br /> <br />Metropolitan Water Supply Investigations - Phase II Plan of Study <br />8/16/94 5:04 PM <br /> <br />Page 3 <br /> <br />B, Project Objectives <br /> <br />Pursuant to the authorization for funding of the Project by the Colorado General <br />Assembly and the Governor's Executive Order establishing the Front Range Water <br />Forum, the primary objective of this study is to identify and support cooperative <br />solutions to Denver metro area water supply problems. The key to achieving this <br />goal is the involvement of the TAC with its charge to foster collaborative efforts <br />among water users and to take advantage of existing areas of information and <br />expertise, <br /> <br />In April of 1994, the TAC held a two-day retreat intended to enhance working <br />relationships between members, develop ground rules and a mission statement for <br />continued work, and define an organizational structure that would promote timely <br />completion of scoping. The T AC initially agreed to focus the Project's efforts on <br />four categories of water supply options: Conjunctive Use; Effluent Management; <br />Interruptible Supply; and Systems Integration. Four work groups were established <br />to develop scopes of work and to oversee the efforts of the consulting team in <br />carrying out the necessary investigations. <br /> <br />Following the retreat, the work groups each held several meetings and developed <br />scopes of work for Phase II of the Project which are summarized below. <br /> <br />1. Conjunctive Use <br /> <br />Conjunctive use is the coordinated use of surface and ground water in such a way <br />that a more efficient use of each resource is achieved than could be attained by <br />separate and independent use. For the purpose of this investigation, conjunctive use <br />has three water supply components: 1) surface water supplies from various sources, <br />2) ground water in the Denver Basin bedrock aquifers north of the Palmer Divide, <br />and 3) ground water in the South Platte alluvial aquifers. <br /> <br />The Phase II scope of work for the conjunctive use investigations will: 1) review <br />background information on components and issues of conjunctive use of surface <br />water with Denver Basin ground water and with the South Platte alluvial aquifers; 2) <br />initially identify conceptual conjunctive use plans; and 3) provide design criteria and <br />economic analysis of the conceptual plans. <br /> <br />2. Effluent Management <br /> <br />The purpose of this investigation is to develop conceptual effluent management plans <br />which focus on increasing regional water supplies while complementing (or at least <br />not interfering with) water quality efforts of the Metro Wastewater Reclamation <br />District and others. <br />
The URL can be used to link to this page
Your browser does not support the video tag.