My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08137
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08137
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:18 PM
Creation date
10/12/2006 2:46:51 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.09.J
Description
Navajo Project
State
AZ
Basin
Colorado Mainstem
Date
10/1/1979
Title
Review of the Bechtel Corp. Report Entitled Navajo Generating Station Conceptual Planning Report to the Arizona State Water Quality Control Council and the U.S. Dept of Interior Dated Sept. 1970
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />~. <br /> <br />.... <br />. . <br /> <br />~ <br /> <br />c tower operation would be at 13 cycles of concentration. Softening and <br />filtration of the blowdown water would be required before introduction <br />to the reverse osmosis equipment. Concentrated wastes would be sent <br />to evaporation ponds which would require approximately 164 acres. <br /> <br />7. Pretreatment and Flash Evaporation (Option 4c). Flash evapo- <br />ration equipment would be used for treatment of the cooling tower blow- <br />do\V!l water with pl~~t makeup water pretreatnent and cooling tower water <br />concentrations as described above. <br /> <br />Even though the report did not include cost information on any <br />of the schemes, the above described seven schemes were presented as <br />being less economical than returning the blowdown water directly to <br />Lake Powell. <br /> <br />3 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.