My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08093
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08093
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:30:08 PM
Creation date
10/12/2006 2:46:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/1/1976
Author
USDOI-BOR
Title
Animas-La Plata - Feb. 1976
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />APPENDIX A <br /> <br />il' <br />17 <br /> <br />-. <br />~1 <br /> <br />water for Red Mesa and Dry Side areas. Water from the La Plate ~I <br />River would be diverted into the-reservoir through a small diversion <br />dam and canal. <br /> <br />The Animas Power Plant, located on the Animas River 12 miles north of <br />Durango, would generate power to be used along with supplemental <br />---purchase.s-of ]5o\\:1er from the Colorado River Storage Project to provide <br />power for project ptunping. This plant would be a "run of the river" <br />type that would utilize a 2.5 mile long tunnel to gain 330 feet of <br />dynamic head. The plant itself would be recessed into the vertical <br />canyon wall to minimize asthetic degradation. <br /> <br />" <br /> <br />')' <br />:; <br /> <br />Sprinkler irrigation is planned for all projectlands.-Theunder- <br />ground lateral systems would provide sprinkler pressure at each farm <br />turnout. Ptunping plants would provide this pressure where the ground <br />slope is insufficient to adequately pressurize the pipelines. Pro- <br />. ject-drains.wou1d be provided, wher~ required, on project . land.. - <br /> <br />-;, <br /> <br />{~i <br />~t,. <br /> <br />Fisheries would be created in the inactive pool of project reservoirs, <br />In addition, recreational facilities would be provided at each reser- <br />voir. <br /> <br />.... .~ <br /> <br />,., <br /> <br />SCHEDULE <br /> <br />. :.~, <br />(:~~i <br />L <br />~,. <br />~ '1 <br />1~ , : '. <br />,'. <br /> <br />-The Definite Plan Report and Environmental Statement are scheduled <br />for completion in May 1977. Environmental hearings are scheduled <br />.for September 1977 and repayment contracts with the Colorado and <br />New Mexico Water Conservancy Districts are expected to be executed <br />- _ during January 1978. .. Construction activities in the form of land <br />acquisition and minor contracts could begin during F.Y. 1978. <br /> <br />-;" <br /> <br />>",;: <br /> <br />~?:4 <br />;.;~~ <br />~-~- <br />~~>~ <br /> <br />,~ . <br /> <br />., <br />i <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.