My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08091
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:59:10 PM
Creation date
10/12/2006 2:45:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix L Recreation
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />. <br /> <br />. <br /> <br />..' <br /> <br />'.) <br /> <br />I.. <br /> <br />2' ''l('Q <br />. t. v v <br /> <br />At eaoh o~ tho other sites, with the.exception of Cebolla; state high- <br /> <br />~ays of lesser importance wilJ_ also resuire relocatiofi. lhe bureau of <br /> <br />Reclamation has indicated on the reservoir maps of Blue "~sa and Gate- <br /> <br />view, proposed relocations for existin~. highways. These relocations <br /> <br />as shown, appear to be too close to the reservoirs to ~errr~t maximum <br /> <br />recreation use of t~e shore lines. <br /> <br />B. Hecoc1~endations <br /> <br />The follo...,ing recOiamendations are rrede: <br /> <br />1. That the Blue "',esa, Gateview and Cebolla rleservoir <br /> <br />sites be given further datailed study if and wilen the dams are <br /> <br />authorized for construction. <br /> <br />2. That if a road io to be constructed in connection <br /> <br />with the power plant proposed for the Taylor ~ark site, further de- <br /> <br />tailed study be given the site if and when the d&~ is authorized for <br /> <br />construction. <br /> <br />3. That the oUTeau restudy the present proposed vlans of <br /> <br />operation for the A1Jnont and Curecanti Heservoirs to determine if it <br /> <br />is possible to ~int~in a more constant water level during the recre- <br /> <br />ation season. If this is Vo~~ible, further detailed study should <br /> <br />be given to recreation jJossibilities of these t"o areas. <br /> <br />4. That further study be given to the problem of <br /> <br />hi8hway relocations at Blue nesa, Curecanti and Gateview sites in <br /> <br />an attempt to find sllitable ali(;nments back from the shore lines of <br /> <br />these reservoirs, since the proximity of the proposed alignments to <br /> <br />these shores will allow for only limited developments, thereby <br /> <br />affecting recreation usa of thase areas. <br /> <br />5. Further investigation of historical values in- <br /> <br />valved in t!.,is group 0'. reservoirs should be undertaken in accordance <br /> <br />.;ith recommendations contained in Section THO - H of this report. <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.