Laserfiche WebLink
<br /> <br />Resource Protection Plan data <br /> <br />Project Features <br /> <br />Sprinkler irrigation component <br />Canal and lateral miles eliminated <br />Off-farm systems placed in pipe <br />Onfarm systems improved <br /> <br />Winter water replacement component <br />Culinary connections <br />Price River Water Improvement District <br />North Emery Water Users Association <br />Stockwater ponds lined <br />San Rafael basin <br />Price basin <br />Cottonwood Creek pipeline developed <br /> <br />Estimated Costs (Preferred Plan) <br /> <br />Construction costs (1989 prices in dollars)' <br /> <br />Off-farm pipeline systems <br />Carbon system <br />Huntington-Cleveland systems <br />Cottonwood system <br />Ferron system <br />Price-Wellington system <br />Moore system <br /> <br />Onfarm irrigation system (70-percent Federal cost share) <br />Carbon system <br />Huntington-Cleveland systems <br />Cottonwood system <br />Ferron system <br />Price-Wellington system <br />Moore system <br /> <br />Culinary system - capital cost <br />Price River Water Improvement District <br />North Emery Water Users Association <br /> <br />Stockwater ponds <br />Cottonwood Creek pipeline <br /> <br />Total <br /> <br />, Does not include planning costs. <br /> <br />156 miles <br />97 miles <br />36,050 acres <br /> <br />50 connections <br />163 connections <br /> <br />12 ponds <br />71 ponds <br />10.6 miles <br /> <br />$ 8,212,400 <br />$ 5,405,800 <br />$ 5,600,000 <br />$ 6,745,300 <br />$ 3,542,400 <br />$ 677 ,400 <br /> <br />$10,502,110 <br />$10,612,280 <br />$ 7,434,440 <br />$ 7,291,050 <br />$ 4,885,358 <br />$ 1,563,331 <br /> <br />$ 197,000 <br />$ 846,000 <br /> <br />$ 1,915,000 <br />$ 2.221,000 <br /> <br />$77,710,820 <br /> <br />Summary <br /> <br />OOCi433 <br /> <br />S-tt <br />