My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08031
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:52 PM
Creation date
10/12/2006 2:43:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title 1 - Yuma Desalter
Basin
Colorado Mainstem
Date
4/1/1977
Author
USDOI/BOR
Title
Colorado River Basin Salinity Control Project - Title I Division - Desalting Complex Unit, Arizona - Status Report
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> TAB LE OF CONTENTS (Continued) <br /> Page <br /> 2. Description of Desalting Plant 90 <br /> a. Pretreatment System and Associated Works 92 <br /> (I) Intake and Chlorination 92 <br /> (2) Grit Sedimentation Basins 94 <br /> (3) Intake Pumping Plant 95 <br /> (4) Solids Contact Reactor 97 <br /> (5) Dual Media Gravity Filters 100 <br /> (6) Clear Well 103 <br /> (7) Backwash Sump 103 <br /> (8) Bypass Piping Around Clear Well 104 <br /> (9) Pretreatment Control Building 104 <br /> (10) SI udge Ha nd Ii ng 104 <br /> (II) Chemical Handling and~ Storage Facilities 106 <br /> b. Desalting System and Associated Works 109 <br /> (I) Clear Well Pumping Plant 109 <br /> (2) Desalting Building 1\2 <br />. (3) Administration Building and Visitor', <br /> Facilities 115 <br /> (4) Standby Power 116 <br /> (5) Fire Protection Equipment 116 <br /> c. Appurtenant Works 117 <br /> (I) Potable Water Supply 117 <br /> (2) Sewage Treatment Plant 117 <br /> (3) Maintenance Building 118 <br /> (4) Energy Recovery and Chlorine Building 118 <br /> (5) Miscellaneous Structure Foundations 119 <br /> (6) Pipelines 119 <br /> (7) Power Supply Source 120 <br /> (8) Power Transmission 129 <br /> (9) Desalting Plant Switchyard 131 <br /> (10) Electrical Distribution 132 <br /> (I I) Plant Site Canals 133 <br /> (12) Spend Chemical Solution Pond 133 <br /> ( 13) Access 133 <br /> (14) Landscaping 134 <br /> 3. Equipment Procurement and Specifications 134 <br />. <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.