My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08031
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:52 PM
Creation date
10/12/2006 2:43:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
Title 1 - Yuma Desalter
Basin
Colorado Mainstem
Date
4/1/1977
Author
USDOI/BOR
Title
Colorado River Basin Salinity Control Project - Title I Division - Desalting Complex Unit, Arizona - Status Report
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />Page <br /> <br />3. Utilization of Desalted Water <br />4. Bypass of Reject Stream <br /> <br />68 <br />68 <br /> <br />C. Interim Salinity Control <br /> <br />70 <br /> <br />CHAPTER VII. <br /> <br />DESALTING PROCESS SELECTION <br /> <br />71 <br /> <br />A. Processes Considered <br />B. Process Performance Requirements <br /> <br />71 <br />71 <br /> <br />I. <br /> <br />Operational Design Parameters <br /> <br />72 <br /> <br />a. Feed Water Salt Concentration <br />b. Feed Water Temperature <br />e. Product Water Quality <br />d. Energy <br />e. Feed-Water Source <br />f. Reject Disposal <br />g. Site Location <br />h. Environmental Factors <br /> <br />72 <br />72 <br />73 <br />73 <br />74 <br />74 <br />74 <br />74 <br /> <br />. <br /> <br />C. Comparison of Processes <br /> <br />75 <br /> <br />I. Process Cost Comparison <br />2. Plant Investment and Operating Cost Comparison <br /> <br />75 <br />77 <br /> <br />D. Process Selection Conclusions <br />E. Membrane Plant Operating Experience. <br /> <br />78 <br />78 <br /> <br />I. <br /> <br />Conclusions <br /> <br />79 <br /> <br />a. Design <br />b. Operation <br /> <br />79 <br />79 <br /> <br />2. Rt':comm~ndatioJls <br /> <br />80 <br /> <br />a. Planning and Design <br />b. Operation <br /> <br />80 <br />81 <br /> <br />F. Yuma Desalting Test Facility <br />G. Optimization <br /> <br />81 <br />83 <br /> <br />CHAPTER VIII. PROJECT FEATURES <br /> <br />86 <br /> <br />A. Yuma Desalting Plant <br /> <br />86 <br /> <br />. <br /> <br />I. Location <br /> <br />86 <br /> <br />a. Soils and Foundations <br />b. Alternative Sites <br /> <br />86 <br />87 <br /> <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.