Laserfiche WebLink
<br />~ <br />~ <br />~ <br />-' <br /> <br />c <br /> <br />6 <br /> <br />71ea:JWUj <br />Ildo.anee:J <br />and .b-H<j, <br />7MHt :JJe'bt <br /> <br />Illlocatkm <br />"'7'teaduUf <br />4do.anee:J <br />/M <br />:JJeI~ <br />{jlYtM<iii.J.ty <br />e~:J <br />and . 'tne1tf'f <br />((aiM. <br /> <br />(d) Installation of a selsyn water-level indicating system in <br />the water treatment plant to show the water level in the <br />new 2, 000, OOO-gallon storage tank. <br /> <br />During the year the project received cash advances for con- <br />struction purposes from the United States Treasury of $4, 050, 000, <br />which, together with cash on hand at the beginning of the year, was <br />sufficient to finance the construction program. While appropriations <br />for the fiscal year ended June 3D, 1951, were $6, 100, ODD, we did not <br />require the additional $2, 050, 000, thus saving the 30/0 interest charge <br />that would otherwise have accrued on this amount, as well as on <br />$2,500,000 not drawn from previous appropriations. <br /> <br />Replyrnents to the Treasury amounted to $4, 500, 000 from reve- <br />nues not otherwise required, of which $1, 221, 568.09 was applied to <br />reduce principal and $3,278,431. 91 was applied to payment of in- <br />terest on debt. Interest accruals on debt were fully paid up on <br />May 31, 1951. <br /> <br />The total long-term debt was $111,769,797.30 at May 31, 1951, <br />excluding $25, 000, 000 allocated to flood control, which is deferred <br />for repayment until after June 1, 1987, under the Boulder Canyon <br />Project Adjustment Act. <br /> <br />Since beginning of operations the project has paid in a total of <br />$64,956, 302.41 to the Treasury, of which $50, 626, 159.09 was to <br />satisfy interest accruals and $14, 330,143.32 was in reduction of <br />principal debt. <br /> <br />Under the Adjustment Act, it is required that the Advances to <br />the Colorado River Dam Fund be segregated as between those ap- <br />plied toward construction of generating machinery and equipment <br />(for repayment in the generating charge), and those applied for all <br />other purposes (for repayment in the energy rate). Under a later <br />requirement of Public Law 841, effective June 29, 1948, a third <br />category was added, namely: "non-project" expenditures, relat- <br />ing to certain costs in connection with the expansion of Boulder <br />City beyond normal project necessities, which is discussed else- <br />where in this report. <br />