Laserfiche WebLink
<br />""'" <br />~ <br />1;0 <br />-' <br /> <br />c <br /> <br />Lembke Construction Co. <br /> <br />Drainage Construction Co., <br />and James W. Huntley <br /> <br />Valley Sheet Metal Co. <br /> <br />Boulder Construction, Inc. <br /> <br />Additional high school facilities <br />including shops, Physical Ed- <br />ucation and Industrial Arts <br />Buildings. <br /> <br />Alterations and additions in- <br />creasing the size of Boulder <br />City Water Treatment Plant. <br /> <br />Air conditioning system in <br />MuniCipal Building, Boulder <br />City. <br /> <br />Streets, sidewalks, curbs and <br />gutters in newly developed <br />areas, and extensions of <br />sewerage and water distribu~ <br />tion systems. <br /> <br />During the year work was completed under six contracts as <br />follows: <br /> <br />Name of Contractor <br /> <br />Description of Work <br /> <br />J. A. Tiberti Construction Co. Additional office and storage <br />space in power plant structure. <br /> <br />Lembke Construction Co. <br /> <br />Nevada Construction Co. <br /> <br />4 <br /> <br />Sixteen 5- and 6-room masonry <br />residences, and two masonry <br />car shelters at the Federal <br />Garage. <br /> <br />Extensions of water supply sys- <br />tem on newly developed areas <br />in Boulder City and Lake View <br />addition. <br />