My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08026
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:51 PM
Creation date
10/12/2006 2:43:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1992
Title
Correspondence regarding the Draft Supplement to the 1980 Final Environmental Statement
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />Agreement for Animas-La Plata Project Cost Sharing; (2) changes in <br /> <br />locations of construction access roads, water conveyance facilities, <br /> <br />utility relocations, and locations of borrow and spoil areas and; (3) <br /> <br />chang~s in proposed recreation development at Ridges Basin Reservoir. <br /> <br />Although the supplement will evaluate refinements to the project, other <br /> <br />alternatives to the project will not be discussed because they were <br /> <br />evaluated adequately in the FES. <br /> <br /> <br />Reclamation will consult with other Federal, State, local, and <br /> <br />tribal agencies with specific ~xpertise and interest regarding <br /> <br />environmental impacts resulting from the 404(b)(I) analysis, irrigation <br /> <br />return flows, new or updated information, and project refinements. <br /> <br />Reclamation has determined that a formal scoping program is not <br /> <br />required. Those wishing to provide information with respect to the <br /> <br />DSFES may do so by sending such information to Mr. Daniel Fritz, Durango <br /> <br />Projects Office, at the address given above by June 5, 1992. The draft <br /> <br />supplement is expected to be completed and available for review and <br /> <br />comment by October 1992. <br /> <br />APR 2 4 1992 <br /> <br /> <br />r-. <br />nderwood <br />COl1lllissioner <br /> <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.