My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07999
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:43 PM
Creation date
10/12/2006 2:43:04 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8062.200
Description
Federal Reserved Water Rights - USFS - Water Division 2 - Negotiating Principles and Settlement
State
CO
Basin
Arkansas
Water Division
2
Date
8/21/1996
Author
Unknown
Title
Technical Workgroup - Stream Survey - August 21 1996
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />e <br /> <br />000167 <br /> <br />NATIONAL FOREST RESERVED WATER RIGHT CLAIMS <br />COLORADO WATER DIVISION 2 <br />TECHNICAL WORKGROUP <br />STREAM SURVEY <br /> <br />SURVEY DATE: AUl!ust 21.1996 <br />STREAM NAME: North Fork Lake Creek STREAM NO: 651 <br />SURVEY PARTICIPANTS: See attached attendance list <br /> <br />USFS CLAIM: <br />QP: Sec 22, TllS, R82W <br />at east section line, just <br />downstream from the <br />Twin Lakes Tunnel (move to <br />just above Tunnel) <br />WATER RIGHTS: <br />Number of Absolute: <br />Number of Conditional: <br />Exchange\Replacement Potential: Yes <br />Estimate Amount: <br />Time of Year: During runoff <br />Existing Instream Flow: 10 cfs year roundfrom headwaters to South Fork con fl. <br />Current Water Right Administration: Receives inflow from Twin Lakes Tunnel. Call is <br />(Le. called\futile call\none) at or downstream of Twin Lakes Reservoir from <br />June 1 through the irrigation season. <br /> <br />Amount: CWCB 10.0 cfs year round <br />down to South Fork confl. CDaW to <br />review values at QP. USFS willing to <br />accept CWCB values. Also, want <br />flushing flow to move sediment. <br /> <br />Net Amount: <br />Net Amount: <br /> <br />RESERVOIRS: <br />Number of Existing: <br />Number of Potential Sites: 2 breached ponds <br />and 1 near the QP <br /> <br />Size AF: <br />Size AF: <br /> <br />CLIMATE: <br />Weather Station: <br />Average Precipitation: <br />Snow Course: Independence Pass, Twin Lakes Tunnel, Four-Mile Park <br />Average May I Depth: 46", 27", and no data respectively <br />Average May I Water Content: 16.9", 8.8", and.1" respectively <br /> <br />LAND USE: <br />Topography: <br />7.5 Quad Maps: <br />Average Slope: <br />Slope Stability Problems: <br />Soil Type: <br />Federal Acres: 85%+ <br />Private Acres: 15% mining claims <br />Zoning: <br />USFS Management Unit: Part of stream is in or boarders on wilderness area <br />Future Development\Use Potential: <br />Type: <br /> <br />I <br />,"i'~, <br />~ ..,.oM <br />
The URL can be used to link to this page
Your browser does not support the video tag.