Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />I <br /> <br />Table 1 <br />Plans Proposed for Consideration <br />(Shown by Group) <br /> <br />--------------------------------------------------------------------------- <br /> <br />Plan <br />Number <br /> <br />Plan <br />Description <br /> <br />I <br /> <br />-------------------------------------------------------------------------- <br /> <br />I <br /> <br />A- 1 <br />A- 2 <br />A- 3 <br />A- 4 <br />A- 5 <br />A- 6 <br />A- 6A <br />A- 7 <br />A- 8 <br />A- 8A <br /> <br />I <br /> <br />I <br /> <br />B- I <br />B- 2 <br />B- 3 <br />8- 4 <br />B- 4A <br />8- 5 <br />B- 6 <br />B- 6A <br />B- 7 <br />B- 8 <br />B- 9 <br />B-I0 <br />B-11 <br />B-12 <br />B-13 <br />B-14 <br />B-15 <br />B-16 <br />B-17 <br />B-18 <br />B-19 <br />B-20 <br />B-21 <br />B-22 <br />B-23 <br />B-24 <br />B-25 <br />B-26 <br />B-27 <br />a-28 <br />a-29 <br />8-30 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />c- 1 <br />c- 2 <br />c- 3 <br />c- 4 <br />c- 5 <br />c- 6 <br /> <br />I <br /> <br />Operate YDP as planned (Base Case) <br />Operate YDP with off-peak, fi~ power <br />Operate YDP with non-firm power <br />Operate YDP with off-peak, non-firm power <br />Install state-of-the-art low-pressur~ membranes <br />Use 1/3 effective capacity of the YDP <br />Use 2/3 effective capacity of the YDP <br />Pre-pay future electrical capacity charges <br />Install solar power generator (with reject stream replacement) <br />Install solar power generator (without reject stream replacement) <br /> <br />Pump from Protective and Pumping Regulato~y Unit ~ells ~PRPU) to N~B <br />Pump from PRPU to Arizona water users <br />Finance cost of onfar.m improvements (below Imperial Dam) <br />Implement weather modification (80,000 acre-ft delivered to Hex.) <br />'Implement weather modif.ication (116,000 acre-feet delivered to Mex.) <br />Management of w~tershed <br />Implement vegetation management (Phreatophyte Control) 50% <br />Implement vegetation management (Phreatophyte Control) 75% <br />Improve irrigation syst~s - Ari~ona <br />Improve irrigation systems - California <br />Install well field adjacent to the Al~-American Canal <br />Obtain water from "Closed Basin" project in Colorado <br />Use unallocated storage in Fontenelle Reservoir <br />Build .off-stream reservoirs <br />Enlarge proposed Spring Canyon Reservoir <br />Enlarge Painted Rock Reservoir <br />Modify Painted Rock Rese~voir operations <br />Develop ground-water recharge <br />Develop other well fields <br />Lease Indian land <br />Buyout Wellton-Mohawk Irrigation and Drainage District <br />Purchase of water rights by Federal Government (excl. Wellton-Mohawk) <br />Forgive part. Districts' indebtedness in exchange for substitute water <br />Compensate far.mers for lost production during dry years <br />Find alternate uses for untreated drain water <br />Develop Rocky Mountain east-slope exchange <br />Develop trans-basin diversion into Colorado River Basin <br />Desalt upstream brine inflows (Title II projects) <br />Implement M&I water conservation <br />Implement Yuma Mesa Entitlement Exchange <br />Use unallocated storage in Alamo Reservoir <br />Expand Wate~ Management and Conservation in Wellton-Mohawk <br /> <br />Compensate Mexico <br />Compensate Arizona <br />Negotiate maximum allowable salinity level at NIB <br />Breach Minute 242 up to a maximum salinity level <br />Modify Colorado River operations <br />Require all water users to provide acceptable quality return flow <br /> <br />---------------------------------------------------------------------------- <br /> <br />I <br />