Laserfiche WebLink
<br />I <br />I <br />I <br /> Figure 1-1 <br />I Figure II-1 <br />Figure II-2 <br /> Figure II-3 <br />I Figure II-4 <br />Figure II-5 <br />Figure II-6 <br />I E'igure III-l <br /> Figure III-2 <br />I Figure II 1-3 <br />Figure 1II-4 <br />I Figure III-5 <br />Figure III-6 <br /> Figure II 1-7 <br />I E'igure IV-1 <br />I Figure IV-2 <br />Figure IV-3 <br />I Figure IV-4 <br />Figure IV-5 <br />Figure IV-6 <br /> Figure IV-7 <br />I Figure IV-8 <br />Figure IV-9 <br />I Figure V-1 <br />Figure V-2 <br />Figur e V-3 <br />I E'igure V-4 <br />Figure VII-1 <br /> Figure VII-2 <br />I Figure VII-3 <br />Figure VII-4 <br /> Figur e VII-5 <br />I Figure VII-6 <br />Figure VII-7 <br />Figure VII-8 <br />I E'igur e VII 1-1 <br />Figure VIII-2 <br />I <br />I <br /> <br />CACHE LA POUDRE PROJECT <br />RECONNAISSANCE REPORT <br />LIST OF FIGURES <br /> <br />Cache la poudre River Basin <br />Cache la Poudre River Basin <br />Segments of the Cache la poudre River Corridor <br />Schematic of Existing Cache la Poudre Water Facilities <br />Lower Basin Cache la Poudre River <br />Reliability Council Regions <br />Western Systems Coordinating Council Regions <br /> <br />Cache la Poudre River Catchment <br />Upstream From Mouth of the Canyon <br />Recorded Annual Streamflow at Mouth of the Canyon <br />Transmountain Diversions into Upstream Catchment From Mouth <br />of the Canyon <br />COlorado-Big Thompson Project Annual Delivery to Basin <br />Major Diversions From Upstream Catchment From Mouth of the <br />Canyon <br />Native E'lows at Mouth of the Canyon <br />Inflow Design Floods <br /> <br />Rural Domestic Water Systems; Larimer, Boulder and Weld <br />Counties <br />Average Monthly Diversions, Fort Collins and Greeley Pipe- <br />lines <br />Irrigated Acres Existing in 1980 <br />Water Balance for Irrigated Land <br />Typical Weekly Load Curve, 1980 System Load Data <br />Typical Weekly Load-Duration C~rve, 1980 System Load Data <br />Typical Weekly Load-Duration Curve, 1990 System Load Data <br />Typical Weekly Load-Duration Curve, 2000 System Load Data <br />Rocky Mountain Power Area Projected Peak Load 1982 - 2001 <br /> <br />Preliminary Alternative Project Configurations <br />Model Configuration Alternative 1 <br />MOdel Configuration Alternative 6 <br />Model Configuration Future without Project <br /> <br />Grey MOuntain Dam <br />New Seaman Dam <br />Elkhorn Dam <br />Idylwilde Dam <br />Preliminary Alternative 1 <br />Preliminary Alternative 8 <br />prel'iminary Alternative 2 <br />Preliminary Alternative 7 <br /> <br />Projected Schedule of Development Activities <br />Conceptual Cash Flow Diagram <br /> <br />viii <br />