My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07958
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:35 PM
Creation date
10/12/2006 2:41:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Unit - Reports
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1967
Author
US DoI BoR
Title
Summary of the Report on the Narrows Unit Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(J5S;~; <br /> <br />Eventually, the report with all formal review comments will <br /> <br />be transmitted to the Congress of the United States where it would <br /> <br />be referred to the Interior and Insular Affairs Committees in the <br /> <br />Senate and House. Hearings are generally held by the subcommittee <br /> <br />and then by the full comnlittee in the House and Senate. Meanwhile, <br /> <br />bills for authorization of the Narrows Unit probably will have been <br /> <br />introduced. If the full committees recommend approval of the Unit, <br /> <br />authorization bills will have to be approved by both the House and <br /> <br />Senate. The final bill will then be sent to the President of the <br />United States for approval or veto. <br /> <br />Once the project has been authorized, construction funds are <br /> <br />re~uested two years in advance. <br /> <br />Thus at this time, it is impossible to predict with any degree <br />of accuracy when the Narrows Unit might receive construction funds. <br /> <br />When construction funds are available, a construction period <br /> <br />of 9 years has been estimated for the Narrows Unit. That lengthy <br /> <br />construction period appears to be necessary, primarily because of <br /> <br />the extensive railroad relocation involved. However, every effort <br /> <br />would be made to shorten the construction period, consistent with <br /> <br />sound engineering and fiscal considerations. <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.