My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07958
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:35 PM
Creation date
10/12/2006 2:41:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Unit - Reports
State
CO
Basin
South Platte
Water Division
1
Date
1/1/1967
Author
US DoI BoR
Title
Summary of the Report on the Narrows Unit Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(- ('- <br />) ~:J~, <br /> <br />'J{JJw" ~MIJ it ~ ~ ? <br /> <br />The present planning report dated January 1967 constitutes <br /> <br />the final Report of the Regional Director. It is a revision of a <br /> <br />preliminary draft issued in August 1966 which was distributed to <br /> <br />. <br /> <br />the Commissioner of Reclamation in Washington, the Chief Engineer <br /> <br />in Denver, the field offices of other Federal agencies, and to <br /> <br />State and local agencies for review. <br /> <br />All review comments were analyzed and the report was revised <br /> <br />as necessary to become the final report of the Regional Director. <br /> <br />That report will be resubmitted to the Commissioner of Reclamation <br /> <br />who initiates formal processing. <br /> <br />Such further processing normally involves the following <br /> <br />steps: (1) review of the report in Washington by other Interior <br /> <br />Department agencies and by responsible Interior Department <br /> <br />officials; (2) adoption of the report by the Secretary of the <br /> <br />Interior and its formal transmittal to, and review by, the affected <br /> <br />States; the Secretary of the Army, and other Departments and Offices; <br /> <br />(3) completion of a final report by the Secretary of the Interior, <br /> <br />after consideration of the comments received; and (4) submittal <br /> <br />of the report to the President for review by the Bureau of the <br /> <br />Budget to determine applicability of the plan to the Administration's <br /> <br />fiscal policy. <br /> <br />21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.