My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07946
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07946
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:31 PM
Creation date
10/12/2006 2:41:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449
Description
South Platte Projects - Hardin Dam
State
CO
Basin
South Platte
Date
12/1/1982
Author
Dames and Moore
Title
Hardin Dam
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />the Narrows decree is 180,700 ac-ft per year, while that for the 1981 Hardin <br />filing is 150,300 ac-ft per year. <br /> <br />The storable flow for the 1981 Hardin Dam filing was subjected to a <br /> <br /> <br />reservoir operation study using a matrix of assumed storage values and assumed <br /> <br />demands to estimate the net available water at the Hardin Dam site. The <br /> <br /> <br />Narrows decree was similarily evaluated using selected storage values and <br /> <br /> <br />demands. It was concluded there was little difference in net yield from that <br /> <br /> <br />of the 1981 Hardin filing. The sizing and costing of the project then pro- <br /> <br />ceeded to conclusion utilizing the 1981 Hardin filing. <br /> <br />ANALYSIS OF PROJECT YIELD <br /> <br />The market for water depends on its price. Since price, demand and <br /> <br /> <br />project output are all interdependent, it is highly speculative to estimate a <br /> <br />reasonable or optimum allocation of active storage without extensive economic <br /> <br /> <br />analyses. Such analyses were beyond the scope of this study. To overcome <br /> <br /> <br />this problem it was decided to study and present the results of a range of <br /> <br />assumed active storage volumes and assumed demands. The results of the <br /> <br />operation studies for these assumptions is a graphical relationship between <br /> <br /> <br />construction cost, conservation storage volume, reliability and quantity <br /> <br /> <br />of reservoir yield. <br /> <br />., <br />I <br />" <br />I: <br />J, <br />I <br />I <br />I <br />, <br /> <br />Cost, capacity, reliability and yield data for conservation pools <br />ranging in size from 150,000 to 600,000 ac-ft using reservoir operation <br />studies were developed. Because of the large fixed costs of foundation <br />preparation and providing surcharge storage, a minimum conservation pool of <br />200,000 ac-ft was selected. A conservation pool of 600,000 ac-ft was selected <br />as the upper boundary, because it is the maximum volume which can be stored <br />without flooding significant development at Greeley during the inflow design <br />flood. On the basis of these studies a conservation pool of 400,000 ac-ft <br />with a yield of 100,000 ac-ft per year at 90 percent reliability was selected <br />for detailed study. <br /> <br />Hi <br /> <br />I <br />I <br />I <br />I <br /> <br />I; <br />
The URL can be used to link to this page
Your browser does not support the video tag.