Laserfiche WebLink
<br /> <br />o <br />C) <br />r-) <br />....:J <br />w::. <br />c.o <br /> <br />.' <br /> <br />) <br /> <br />. <br /> <br />. <br /> <br />FY 1986 <br /> <br />. <br /> <br />OKLAHOMA -- In Addition to President's Budget <br /> <br />Project <br /> <br />1. Arkansas Basin Chloride Control <br />Project <br /> <br />2. Arkansas River & Tributaries <br />Hydropower, etc., - W.D, Mayo, <br />Lock &: Dam 14 <br /> <br />3. Arkansas River Municipal, Indust~ial <br />and Agricultural Study <br /> <br />4, Arkansas-Red River Basin Solar Energy <br />Investigation <br /> <br />5, Big and Little Sallisaw Creek <br /> Navigation Project <br />6. Candy Lake <br />7, Central Oklahoma (Water Supply <br /> and Navigation) <br />8, Chikaskia (BR) (OK-KS) <br /> <br />9. Fort Gibson Lake Addition of <br />Hydropower <br /> <br />p.o. Sand Lake <br /> <br />Funds Requested To: <br /> <br />Continue Advance Engineering <br />and Design <br /> <br />Initiate Engineering and Design <br /> <br />Continue Study <br /> <br />Continue Study <br /> <br />Initiate Construction <br /> <br />Continue Construction <br /> <br />Resume Restudy of Economic <br />Features <br /> <br />Early Autho~ization <br /> <br />Authorization - Initiate <br />Engineering and Design <br /> <br />Initiate Planning <br /> <br />23 <br />