Laserfiche WebLink
<br />C":J <br />C) <br />N <br />..... <br />w <br />~ <br /> <br />56 <br /> <br />56A <br /> <br />56 <br /> <br />56A <br /> <br />. <br /> <br />. <br /> <br />releases from Williams Fork Reservoir necessary to satisfy <br />a call against Dillon, Reservoir by senior downstream <br />appropriators. Exchange was limited to the capacity of <br />the powerplant remaining after Historic Moffat Tunnel <br /> <br />replacement. <br /> <br />No limitation on available storage in <br /> <br />Wil.1iams Fork Reservoir was assumed. <br /> <br />Williams Fork - Green Mountain Exchange (CBT Replacement). <br />The simulated Williams Fork - D1110n - Green Mountain <br />Reservoir exchange for CBT replacement was computed as <br />those releases from Wi 11 iams Fork Reservoir, up to the <br />capacity of the Williams Fork Powerplant, after providing <br />historic Moffat Tunnel replacement and simulated Williams <br />Fork-Dillon exchange, necessary to satisfy CBT Project <br />replacement requirements against Green Mountain Reservoir. <br /> <br />Williams Fork - Green Mountain Exchange (Natural Flow <br />Shortage Demand). The simulated Williams Fork - Dillon - <br />Green Mountain Reservoir exchange for natural flow shor- <br />tageswas computed as those releases from Williams Fork <br />Reservoir, up to the capacity of the Williams Fork <br />Powerplant, after providing historic Moffat Tunnel repla- <br />cement, simulated Williams Fork - Dillon exchange, and <br />Willi ams Fork - Dillon - Green Mountain exchange for CBT <br />Replacement, necessary to satisfy a natural flow demand <br />against Green Mountain Reservoir. <br />