My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07869
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07869
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:29:16 PM
Creation date
10/12/2006 2:38:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.600
Description
Colorado Big Thompson Project - Studies
Basin
South Platte
Water Division
1
Date
12/19/1984
Title
DRAFT - Green Mountain Reservoir Water Marketing Hydrology Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C":J <br />C) <br />N <br />..... <br />w <br />~ <br /> <br />56 <br /> <br />56A <br /> <br />56 <br /> <br />56A <br /> <br />. <br /> <br />. <br /> <br />releases from Williams Fork Reservoir necessary to satisfy <br />a call against Dillon, Reservoir by senior downstream <br />appropriators. Exchange was limited to the capacity of <br />the powerplant remaining after Historic Moffat Tunnel <br /> <br />replacement. <br /> <br />No limitation on available storage in <br /> <br />Wil.1iams Fork Reservoir was assumed. <br /> <br />Williams Fork - Green Mountain Exchange (CBT Replacement). <br />The simulated Williams Fork - D1110n - Green Mountain <br />Reservoir exchange for CBT replacement was computed as <br />those releases from Wi 11 iams Fork Reservoir, up to the <br />capacity of the Williams Fork Powerplant, after providing <br />historic Moffat Tunnel replacement and simulated Williams <br />Fork-Dillon exchange, necessary to satisfy CBT Project <br />replacement requirements against Green Mountain Reservoir. <br /> <br />Williams Fork - Green Mountain Exchange (Natural Flow <br />Shortage Demand). The simulated Williams Fork - Dillon - <br />Green Mountain Reservoir exchange for natural flow shor- <br />tageswas computed as those releases from Williams Fork <br />Reservoir, up to the capacity of the Williams Fork <br />Powerplant, after providing historic Moffat Tunnel repla- <br />cement, simulated Williams Fork - Dillon exchange, and <br />Willi ams Fork - Dillon - Green Mountain exchange for CBT <br />Replacement, necessary to satisfy a natural flow demand <br />against Green Mountain Reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.