Laserfiche WebLink
<br />o <br />CJ <br />~ <br />...... <br />w <br />w <br /> <br />51 <br /> <br />52 <br /> <br />53 <br /> <br />54 <br /> <br />51 <br /> <br />53 <br /> <br />54 <br /> <br />55 <br /> <br />. <br /> <br />. <br /> <br />Total Release from Green Mountain Reservoir. The simulated <br />total release from Green Mountain Reservoir includes the <br />minimum required release. Silt Project releases. total <br />water sales releases. and power releases for reservoir <br />storage regulation. but excludes any required spf1ls in <br />excess of powerplant capacity (Line 51 . line 47 + Line 48 <br />+ Line 49 + Line 50). <br /> <br />52 <br /> <br />Spill in Excess of Powerplant Capacity. Simulated spills <br />from Green Mountain Reservoir are releases in excess of <br />powerplant capacity which are required to regulate reser- <br />voir storage. <br /> <br />Total Outflow from Green Mountain Reservoir. The simulated <br />total outflow from Green Mountain Reservoir is computed as <br />the total reservoir release plus any spills (Line 53 .. <br />Line 51 + Line 52). <br /> <br />Windy Gap Depletion. Estimated depl~tions by the Windy Gap <br />Project were taken from previous Western Divis ion System <br />simulation studies accomplished by the South Platte River <br />Projects Office in Loveland. CO. Data for the previous <br />studies was furnished by the Northern Colorado Water <br />Conservancy District. <br /> <br />, <br /> <br />55 <br /> <br />Williams Fork - Dillon Exchange. The simulated Williams <br />Fork - Di lIon Reservoir exchange was computed as those <br /> <br />. <br />