Laserfiche WebLink
<br />42 <br /> <br />a <br />C) <br />f\:) <br />~,~ <br />N <br /><Xl <br /> <br />42A <br /> <br />43 <br /> <br />43A <br /> <br />438 <br /> <br />42 <br /> <br />42A <br /> <br />, 43 <br /> <br />. <br /> <br />. <br /> <br />End of Month Usable Storage in Green Mountain Reservoir. <br />The simulated end of month total usable reservoir storage <br />is computed as the end of month usable reservoir storage <br />at the beginning of the period plus inflow minus outflow. <br /> <br />Remaining Paper Fill. The simulated remaining MpaperM fill <br />requirement is computed as the amount of storage left to be <br />filled in order to satisfy the annual fill requirement of <br />Green Mountain Reservoir. The beginning of the paper fill <br />was set as April 15 in this study. The beginning MpaperM <br />fill is computed as the difference between the maximum <br />storage capacity and the storage on April 15. The MpaperM <br />fill is reduced each computational period by the amount of <br />inflow in excess of the minimum 60 3/s flow. Releases from <br /> <br />storage or release of storable also inflow reduce this MpaperM <br /> <br />fill. <br /> <br />End of Month Total Storage in Green Mountain Reservoir. <br />The simulated end of month useable reservoir storage is com- <br />puted as the end of month useable storage plus dead storage. <br /> <br />43A <br /> <br />Green Mountain Surface Area, Acres. The simulated surface <br /> <br />area, in acres, of Green Mountain Reservoir for the given <br /> <br />end-of-period total reservoir storage content. <br /> <br />438 <br /> <br />Green Mountain Elevation, Feet. The simulated water sur- <br /> <br />face elevation, in feet, of Green Mountain Reservoir for <br /> <br />the given end-of-period total reservoir storage content. <br />