Laserfiche WebLink
<br />o <br />o <br />I'\:) <br />~..... <br />l'\:I <br />-.J <br /> <br />39 <br /> <br />40 <br /> <br />41 <br /> <br />. <br /> <br />. <br /> <br />CBT Project required replacement releases for the month <br /> <br />under consideration. <br /> <br />Any 9ains in reservoir storage <br /> <br />during the fill period starting on Apr1115 first refilled the <br />replacement pool. limited to the maximum replacement pool <br />capacity of 52.000 acre feet. before the usable power pool <br />accrued any gain. <br /> <br />39 <br /> <br />Usable End of Month Storage in Green Mountain Reservoir <br /> <br />Power Pool. <br /> <br />The simulated end of month usable storage in <br /> <br />the Green Mountain Reservoir power pool is computed as the <br />previous end of month storage in the power pool plus the <br />change in reservoir storage minus the change in the <br />replacement pool storage. <br /> <br />Dead Storage, Green Mountain Reservoir. The present dead <br />storage in Green Mountain Reservoir is 6,860 acre feet and <br />is the amou~t used for this study. Dead storage is defined <br />as the reservoir storage below the inlet sill of the outlet <br />works. elevation 7800 feet. <br /> <br />41 <br /> <br />Change in Storage in Green Mountain Reservoir. The simu- <br />lated change in reservoir storage is computed as the <br />end of month usable reservoir storage the month under <br />consideration minus the beginning of the month useable storage <br />