Laserfiche WebLink
<br />. " <br /> <br />f~'.' <br /> <br />.f <br />, <br /> <br />...~'" <br /> <br />-)., <br /> <br />.' <br /> <br />~J~ <br /> <br />2305 <br /> <br />In light of these points, we conclude that in continued planning for the <br />comprehensive development of the South Platte Valley, the Narrows <br />Reservoir and associated Bijou Creek control works be selected as the plan <br />for downstreBIII storage. <br /> <br />Since this plan for Narrows is authorized, it should be possible to under- <br />take construction as soon as fUnctions and reservoir capacity are verified <br />in relation to its integrated operations with an upper reservoir, probably <br />at the T1oiO Forks site. <br /> <br />We will appreciate receiving, as soon as possible, your views and sugges- <br />tions and those of the Steering Committee on the report. <br /> <br />Very truly yours, <br /> <br />d' o-P~)~)' ^~ <br />, '- <br />.''-..... .......- <br />-...-Bfrector <br /> <br />Enclosures <br /> <br />2 <br />