My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />COLORADO RIVER STORAGE PROJECT <br />GLEN CANYON UNIT <br />(Continued) <br /> <br />DISTRIBUTION OF ALLOCATED COSTS AND REPAYMENT (Unit--$l, 000) <br /> <br /> Section 5 (Basin Fund) Section 8 <br /> Fish & Rec- Fish & <br /> wildlife reation wildlife <br /> Irri - enhance- enhance- <br /> gation Power ment ment Total <br />Distribution <br />Construction costs 11 42;'643 2,73, ,632: 6,,386 15,692 200 3~8, 553 <br />Reimbursable iIlterest <br />during construction <br />at 2 7/8 percent 24,903 24,903 <br />Annual OM&R costs - <br />Sec. 5 on 2 7/8 pct. <br />and Sec. 8 on 2 1/2 <br />percent 6 1,503 5 1,532 3,046 <br /> <br /> Repav{Ilent Y <br /> Construction costs 42,643 273,632 NR NR ~R 3~6,275 <br /> Int. during const. 24,903 ?4,903 <br />. Annual OM&R "y6 1,503 11 .Y' 1,509 <br /> <br />11 Excludes $2,415,000 contributed funds and $628,000 CRDF expenditure. <br />Y Paid with Storage project power revenues. <br />11 Paid from Bureau's annual appropriation. <br />.Y' PaId from Park Service's i;lnnua1 appropriation. <br />NR Nonreimbur$ab1e. <br /> <br />E~lanation: The authorized units of the CRSP, including the Glen Cai'\yon <br />Unit, are considered as one project in the cost allocation and repayme~t <br />stuClies. All reimbursable costs will be repaid from power revenues through <br />the Upper Colorado River Basin Fund. With average selling fates of 6 mms <br />a kpowatt-hour for firm energy anp 2.5 mills for nonfirm energy, net power <br />revenues wlllbe sufficient to r"'pay the required costs of each unit of the <br />project within 50 years fOllowiIlgcompletion. <br /> <br />IRRIGATION <br />No irrigation will be directly provided by this unit ~ However, by <br />providing storage to meet commitments to the Lower Elasin, it will <br />permit upstream irrigation diversions by participating' pioj ects. <br /> <br />POWER AND MUNICIPAL WATER <br /> <br />. <br /> <br />Power: Powerplant's nameplate rating will be 900,000 kilowatts. <br />Municipal Water: Water will be furnished for the town o(Page, Ariz. <br /> <br />Benefit-:cpst Ratio: 1.4:1 <br /> <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.