My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07800
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:57 PM
Creation date
10/12/2006 2:36:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.25
Description
CRSP
Basin
Colorado Mainstem
Date
12/15/1960
Author
UCRC
Title
Colorado River Storage project Construction and Investigation Activities
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER STORAGE PROJECT <br />GLEN CANYON UNIT <br /> <br />. <br /> <br />LOCATION: <br /> <br />Upper Colorado River Basin--Northern Arizona in Coconino <br />County and southeastern Utah in Kane and San Juan Counties. <br />The dam is on the Colorado River about 4 miles south of <br />the Arizona- Utah boundary. The reservoir will extend into <br />southeastern Utah. <br /> <br />AUTHORIZATION: Public Law 485, 84th Congress, 2nd Session (70 Stat. 109), <br />approved April 11, 1956, and Public Law 85-529 (Stat. 225), <br />approved June 27, 1960. <br /> <br />PLAN <br />The primary purpose is the storage of flood flows of the Upper <br />Colorado River and the generation of hydroelectric power. The <br />stored water will allow compliance with the terms of the Colorado <br />River Compact and will, by exchange, furnish an irrigation supply <br />for the participating proj ects in the Upper Basin states. In 'addition, <br />there will be benefits from fish and wildlife conservation, and <br />improved recreational opportunities and minor benefits to flo<;1d <br />control and silt retention. <br /> <br />COSTS (Federal) <br /> <br />. <br /> <br />Construction <br />Section 5 (Basin Fund) costs..ll <br />Glen Canyon Dam and Reservoir $ <br />Glen Canyon powerplant & switchyard <br />Protection of Rainbow Bridge <br />General Property <br />Total <br />Section 8 costs <br />National Park Service (recreation) <br />Bureau of Sports Fisheries & Wildlife <br />Total <br />Grand Total <br /> <br />173,236,887 <br />119,536,000 <br />25,000,000 <br />7,931,000 <br />$ 325,703,887 <br /> <br />15,692,000 <br />2001000 <br />15,8~2jOOO <br />$ 341,595,,887 <br />" <br /> <br />Annual Opera~ion, Maintenance, and Replacements <br />Bureau facilities <br />National Park Service (recreation) <br />Total <br /> <br />y 1,514 <br />1,532 <br />3,046 <br /> <br />V Based on current value of awarded contracts and estil!lated <br />'fi~lue of cpmpletion contracts, at January f~6q price lev~l, ip.glMding <br />contingenCies for possible increases in price levels.. ' , <br />'! ?:.I Based on 1960 prices with replacements computed using a <br />2 7/8 percent sinking fund. <br /> <br />. <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.