Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />COLORADO RIVER STORAGE PROJECT <br />;NAVAJO UNIT <br />(Continued) <br /> <br />DISTRIBUTION OF ALLOCATED COSIS AND REPAYMENT: (Unit--$l,OOO) <br /> <br />Distribution <br />Construction costs 1.1 <br />Reimbursable interest <br />during const. at <br />2 7/S-percent <br />Annual OM&R at 2 7/8 <br />pct on Sec. 5, and <br />2 1/2 pct,on Sec. 8 <br /> <br />, Repayment <br />Construction costs <br />Annual OM&R <br /> <br />Section 5 (Basin Fund) Section e <br /> Fish & Fish <br /> Flood wildlife Rec- and <br />lrri- con- enhance rea- wild- <br />gation trol ment !!2!L life Total <br />3.2,861 446 6,000 2,983 502 42,792 <br /> <br />,- - - - - - - - - None - - - - -' -.. -,.- <br /> <br />40' 0 <br /> <br />11 <br /> <br />240 <br /> <br />1 <br /> <br />199 <br /> <br />Y32,S61 NR NR <br />Y 40 Y <br /> <br />NR <br />11 <br /> <br />32,86l <br />40 <br /> <br />NR <br />51 <br /> <br />1.1 Excludes $ 65,000 nonreimbursable CRn Fund inves:tigation expenditures. <br />21 To be paid by State. <br />31 Paid with 'StorC!ge project power revenlil-es. <br />41 Paid from Burea,u' s annual appropriations. <br />11 Paid from Park Service"s annual appropriation. <br />NR Nonreimbursable. <br /> <br />Explanation: The authorizedunlts of the Colorado River Storaqe,Project, <br />including the Navajo unit, are conSidered as one project in cost allocation <br />and repayment, studies. All reimbursable, costs will be repaid from power <br />revenues through the Upper Colorado River Basin Bund. With ave%;age sell- <br />ing rates of 6 mills a kilowatt-hour for finn energy and 2.5 mills for nonfirm <br />energy, net power revenues will be sufficient to repay the ,required costs <br />of each unit of the project within 50 years following its completion. <br /> <br />Benefit-Cost Rati~: 1.2:1 <br /> <br />-ll- <br />