My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07776
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07776
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:52 PM
Creation date
10/12/2006 2:35:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1980
Author
USDOI
Title
24th Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />I <br /> <br />'11"~ ~":" <br />~ ' <br />I~ <br />" . ;; <br />, . <br />j <br /> <br />Damaged area of Currant Creek pipeline <br /> <br />Lyman Project <br /> <br />On the Lyman Project, the Stateline Dam <br />was completed during the fiscal year <br />and on Meeks cabin and Stateline Dam <br />recreation facilities, all work was sub- <br />stantially complete on September 20, <br />1980, <br /> <br />Dallas Creek Project <br /> <br />The Ridgway Dam, Stage 1, is a primary <br />feature of the Dallas Creek Project. <br />A contract for the dam was awarded on <br />December 6, 1979. in the amount of <br />$14,997,765 with the contractor com- <br />pleting about 42 percent of the work by <br />the end of the fiscal year. <br /> <br />~ <br />Navajo Indian Irrigation Project-three-phase <br />power transformer at Gallegos Substation. <br /> <br />Dolores Project <br /> <br />A contract for the construction of the <br />McPhee Dam, a major feature of the <br />Dolores Project, was awarded on July 8, <br />1980, in the amount of $74,102.509, The <br />work was about 3 percent complete by the <br />end of the fiscal year. Another major <br />feature of the Dolores Project is the <br />Bradfield Bridge replacement. A contract <br />for the construction of the bridge was <br />awarded on August 15, 1980, in the <br />amount of $392,650. The work was about <br />20 percent complete by the end of the <br />fiscal year. <br /> <br /> <br />Jordan Aqueduct construction <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.