<br />r <br /> <br />"~.': ""~" .,',' <br /> <br /> <br />Flaming Gorge Lake reflecting the setting sun <br /> <br />On the Jordan Aqueduct, Reach 3, a <br />contract was awarded in April 1980 for <br />$7,781,266 with the contractor beginning <br />construction in July 1980. Road crossing <br />work is continuing with about 13 percent <br />of the contract completed by the end of <br />the fiscal year. Contracts have been <br />awarded to investigate the geology at <br />the Jordanelle Oamsite and Reservoir. <br />Exploratory drilling for foundation inves. <br />ligation is continuing. Vat Tunnel, Straw- <br />berry Aqueduct - the tunnel is about <br />88 percent complete with a total of 34,119 <br />feet completed by the end of fiscal year <br />1980, Work Center Control Building, <br />Currant Creek Recreation Area - an 8a <br />contract was awarded in the amount of <br />$184,797 on July 22, 1980, and by the end <br />oJ September 1980, 21 percent of the work <br />has been completed, <br /> <br />6 <br /> <br /> <br />Observing the lest operation of the Glen Canyon <br />spillway <br /> <br />Jensen Unit, <br />Central Utah Project <br /> <br />Block NO.1 Drains - A contract was <br />awarded in the amount of $652,759 on <br />March 26, 1980. Installation work on the <br />drains continues with 34 percent com- <br />pleted by September 30,1980, <br /> <br />Red Fleet Dam - The Dam was completed <br />April 19, 1980 and approval to fill the <br />reservoir was given in May 1980. Reservoir <br />reached EL, 5577 on June 21,1980, and <br />was drawn down to EL. 5569 by the end <br />of the tiscal year, <br /> <br />Glen Canyon Unit, <br />Colorado River Storage Project <br /> <br />The Service Road Tunnel Rehabilitation- <br />A contract was awarded September 25, <br />1980, in the amount of $3,989,200, <br /> <br />On the Sanitary Landfill Access Road, all <br />work was complete in April 1980. <br /> <br /> <br />Navajo Indian Irrigation Project-Erecting pole <br />along 34.5 kilovolt distribution line. <br /> <br />Flaming Gorge Unit, <br />Colorado River Storage Project <br /> <br />Spillway tunnel repairs - A contract was <br />awarded In the amount of $132,531 in May <br />1980. The contractor has completed <br />54 percent of the work by the end Of the <br />fiscal year. <br /> <br />The contractor substantially completed <br />the work on the Dutch John Water System <br />Enlargement by the end of the fiscal year. <br /> <br />Grand Valley Unit, Colorado River <br />Basin Salinity Control Project <br /> <br />Government Highline Canal, Stage 1 - <br />A contract was awarded in the amount of <br />$7,449,184 in Augusf at 1980, The con- <br />tractor plans to start work the first part <br />at fiscal year 1981, <br /> <br />A contract was awarded July 8, 1980, tor <br />construction of the Grand Valley Field <br />Station in the amount at $362,864, The <br />contractor started work in September <br />1980, <br />