Laserfiche WebLink
<br />Description <br /> <br />Re-Evaluation of Injection Well <br />Location <br /> <br />Redesign Injection Well (s) <br /> <br />Injection Well No. 1 Specs <br /> <br />Prepare and Award Well No. 1 <br />Construction Management Contract <br /> <br />Drill, Canplete and Test Injection <br />Well No. 1 <br /> <br />Water Rights Confinnation <br /> <br />Injection Well No. 2 Specs <br /> <br />Prepare and Award Well No.2 <br />Construction Management Contract <br /> <br />Drill, Canplete and Test Injection <br />Well No. 2 <br /> <br />Amend and Washington Review of <br />Environrrental Assessrrent and DPR <br /> <br />Contracting and Construction of <br />Pernanent Facilities <br /> <br />Projected Schedule <br />PARADOX VALLEY UNIT <br />i June 1983 <br /> <br />1983 <br /> <br />1984 <br /> <br />1985 <br /> <br />1986 <br /> <br />1987 <br /> <br />1988 <br /> <br />1989 <br /> <br /> <br />. <br /> <br />. <br /> <br />--4 <br /> <br />. <br /> <br />. <br /> <br />--" i <br /> <br />.. <br />I <br /> <br />. <br /> <br />. <br /> <br />CIO <br />;t"- <br />V) <br />c.;.:., <br />0> <br /> <br /><;:) <br /> <br />. <br />