<br />formation at a shallower depth. It is anticipated that this location <br /> <br />reanalysis and redesign will lead to a March 1985 well construction con- <br /> <br />tract award. <br /> <br />When the bottom of the hole is reached, a 2-hour injection test will <br /> <br />be conducted. If results from this test are favorable, the well will be <br /> <br />completed and a 2-week injection test will be conducted. The performance <br /> <br />of the well and the need for additional injection wells will be determined <br /> <br />from the results of the two tests. Upon completion of these tests, a <br /> <br />long-term injection test will begin and continue through the completion of <br /> <br />the permanent facilities. <br /> <br />Water Rights <br /> <br />We currently have conditional water rights of 0.26 cfs for each of the <br /> <br />original 19 brine production wells. We have filed an application to make <br /> <br />each of the 24 production wells an alternate point of diversion for the <br /> <br />total water right of 4.94 cfs. We have also filed a plan to augment the <br /> <br />flows of the Dolores River for depletion resulting from the operation of <br /> <br />the project. The State has issued new well permits recognizing the 24 <br /> <br />wells as brine production wells. These permits will allow us to continue <br /> <br />the testing program and to test the injection well. <br /> <br />00C577 <br /> <br />11 <br />