Laserfiche WebLink
<br /> <br />.: 'I <br /> <br />o <br />C7; A projeot-by-projeot anaiysis of the upper Rsd River <br />~ .River sub-basins has been ,made to illustrate some of <br />~ aspeots of the plan of improvement. <br />~'l: <br />~, <br /> <br />and Wsshits <br />the hydrologic <br /> <br />It was reoognized by the Arkansas-White-Red Basins Inter- <br />Agenoy Committee that problems of hydrology snd hydrologic inter- <br />relationships could not be fully resolved during the period of the <br />Inter-Agenoy investigations. 'The AWR report would therefore reoognize <br />the defioienoies remaining at the end of the investigation and make <br />proposals for their resolution in the future. In various seotions of <br />Part II proposals have been made for: Further studies on the hydro- <br />logio effects of projeots and programs, additional hydrologio and re- <br />lated eoonomic analyses and ooordination, and further investigations <br />of alternative water SUpply souroes. A plan for meeting the basio <br />hydrologio data needs of further studies are inoluded in the Hydro- <br />. logio Data Colleotion Program Seotion. A National inter-agenoy pro- <br />jeot for developing hydrologio principles for evaluation of water <br />resources programs is needed to provide a firm basis for inter-agenoy <br />planning. <br /> <br />I <br /> <br />I <br />j <br />I <br />I <br />j <br /> <br />xiv <br /> <br />hi <br />""~1 I <br />l~:;/,~~' <br />