My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP07657
CWCB
>
Water Supply Protection
>
Backfile
>
7001-8000
>
WSP07657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:28:18 PM
Creation date
10/12/2006 2:30:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8046
Description
Section D General Studies - DSS
State
CO
Basin
South Platte
Water Division
1
Date
1/1/3000
Author
Unknown
Title
Colorado Decision Support System - 1997-2001 - CRDSS Administrative Tool - Colorado River Special Project Task
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OiJlll2~ <br /> <br />Northern Colorado Water <br />Conservation District <br /> <br />-- Colorado Big Thompson Project <br />Windy Gap Project <br />City of Pueblo -- Columbine, Ewing and Wurtz Ditch Operations <br />City of Pueblo and Highline -- Busk-Ivanhoe Tunnel <br />Ditch Company <br />Grand River Ditch Co. <br />City of Loveland <br />Farmers Reservoir and <br />Irrigation Company <br />City of Englewood -- Boreas Pass Ditch <br />Twin Lakes Reservoir and -- Twin Lakes (Independence Pass) Tunnel <br />Canal Company <br /> <br />Clinton Reservoir Co. <br />Public Service Co. of Colo. <br />Vidler Water Co <br />Orchard Mesa Irrigation <br />Grand Valley Water Users <br />Association <br />Grand Valley Irrigation Co. <br />Division Engineer <br /> <br />-- Grand River Ditch <br />-- Eureka Ditch <br />-- Berthod Pass Ditch <br /> <br />-- Eisenhower (Straight Creek) Tunnel <br />-- Owens Creek Diversion <br />-- Leon Creek Diversion <br />-- Clear Fork Diversion <br />-- Stillwater Diversion <br />-- Clinton Reservoir Operations <br />-- Shoshone Hydroelectric Plant Opcrations <br />-- Vidler Tunnel Operations <br />-- Orchard Mesa Pump and Hydropower Operations <br />-- Grand Valley Project Operations <br /> <br />-- Grand Valley Canal Operations <br />-- West Slope Users <br /> <br />The new spreadsheets primary purposes are (I) to be able to determine natural <br />now (the undepleted and unregulated now), (2) partial out the natural now to water users <br />in priority, (3) determine the call and calculate the replacement releases from Green <br />Mountain Reservoir using the Division 5 fill accounting(this requires the ability to <br />determine west slope depletions), (4) track and share information on daily basis <br />electronically, (5) generate key reports. "Owe the River Accounting" is still desired on <br />the CRA spreadsheet. <br /> <br />Task I -- Obtain the existing CRA spreadsheet from U.S. Bureau of Reclamation and <br />review. Determine which items remain essential to the CRA spreadsheet and which items <br />will show up on the background operation spreadsheet provided by the water users that <br />are not essential to the computations on either the CRA spreadsheet or Colorado River <br />Administration spreadsheet. <br /> <br />Task 2 -- Incorporate Wolford Mountain Operations; Clinton Reservoir Accounting; <br />Green Mountain I st fill, refill, 2nd fill, bypasses, power call and reservoir accounts <br />including all HUP rule curves; Dillon 2nd fill; Ruedi 2nd fill and reservoir accounts; <br />Palisade Stream Gage and other critical stream gages in addition to Cameo and Dotsero; <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.